文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 高等教育 > 经济学 > 管理会计(英文版)课后习题答案(高等教育出版社)chapter 5
侵权投诉

管理会计(英文版)课后习题答案(高等教育出版社)chapter 5

Managerial Accounnting 7e (Don R.Hansen Maryanne M.Mowen) 管理会计(高等教育出版社) 于增彪(清华大学) 改编 余绪缨(厦门大学) 审校

1. 2. 3.

Overhead rate = $470,000/50,000 = $9.40 per MHr Department A: $250,000/40,000 = $6.25 per MHr Department B: $220,000/10,000 = $22.00 per MHr Plantwide:

70 $9.40 = $658

70 $9.40 = $658 50 $6.25 20 $22

$ 312.50

Departmental:

20 $6.25 $ 125.00 50 $22

Department B appears to be more overhead intensive, so jobs spending more time in Department B ought to receive more overhead. Thus, departmental rates provide more accuracy.

4. Plantwide rate: $250,000/40,000 = $6.25 Department B: $62,500/10,000 = $6.25

Plantwide:

70 $6.25 = $437.50 Departmental:

20 $6.25 $ 125.00 50 $6.25

70 $6.25 = $437.50 50 $6.25

20 $6.25

$ 312.50

Assuming that machine hours is a good cost driver, the departmental rates reveal that overhead consumption is the same in each department. In this case, there is no need for departmental rates, and a plantwide rate is suffi-cient.

上一页第17页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email