1. Overhead rate = $90,000/10,000 = $9 per MHr

2.

Direct materials Direct labor

Overhead ($9 200 MHrs.) Total manufacturing cost Plus 30% markup Bid price Purchasing rate Setup cost rate Engineering rate Other cost rate

= $30,000/5,000 = $15,000/1,000 = $20,000/500 = $25,000/10,000

$4,500 1,000 $7,300 $ 8,600 2,000 $12,400 = $6 per purchase order = $15 per setup

= $40 per engineering hour = $2.50 per MHr $4,500 1,000 90 30 1,000 $7,120 $ 8,600 2,000 120 45 400 $11,665 3.

Direct materials Direct labor Overhead:

Purchasing ($6 15); ($6 20) Setups ($15 2); ($15 3)

Engineering ($40 25); ($40 10) Other ($2.50 200); ($2.50 200) Total manufacturing cost Plus 30% markup Bid price

The activity-based approach to assigning overhead gives a more accurate cost figure because so much of the overhead is nonunit-level and there is product diversity.