文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 自然科学 > 天文/地理 > Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience
侵权投诉

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Tan Siew Ann1, William Cheang2, Ooi Poh Hai2 and Derick Tan3

Centre for Soft-ground Engineering, National University of Singapore, Kent Ridge Crescent, 119260, Singapore.

1

Associate Professor, Director of CSGE, cvetansa@nus.edu.sg Research Scholars, Undergraduate

2 3

1 INTRODUCTION

When properly engineered to satisfy construction requirements, soil nailing is an effective and low-energy intensive method for supporting deep excavations, stabilization and remediation of slopes. Very often, predic-tions of the deformation behavior of a soil-nailed structure through FEM are required to ensure that displace-ment limits set by the construction requirements are not exceeded. Finite element modeling of soil-nailed structure is essentially a three dimensional problem requiring large computational power and resources. The conversion of a 3-D problem to 2D is ideal and has many practical implications in routine engineering analysis and design.

Slope stability analyses are conventionally assessed using Limit Equilibrium (LE) methods and lately the Finite Element (FE) method has been found to be suitable in performing stability calculations. Griffiths and Lane (1999) highlighted that the FE method provides a more powerful alternative to traditional LE methods in assessing stability in their study of unreinforced slopes and embankments. In this paper results are presented for a comparative study that has been made between the FE or LE method for reinforced slope stability. 2 BUKIT BATOK SOIL NAILED SLOPE AND GEO-INSTRUMENTATION

Section 9 was chosen for this study as indicated in Figure 1. The geometry and the position of the soil nails are shown in Figure 2. The soil nails are 150mm in diameter having either a bar size of 40 and 50mm. The lengths of the soil nails are indicated in Figure 2. Vibrating wire strain gauges were located at a spacing of 2m along selected soil nails to measure the development of forces and bending moments. The recorded axial and shear forces at various stages of excavation is given in Figure 3. The recorded lateral displacement of sec-tion 9 is given in Figure 4.

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

Finite Element Analysis of A Soil Nailed Slope-Some Recent Experience

第1页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email