2962K.K.Ang,J.Dai/JournalofSoundandVibration332(2013)2954–2970
Fig.11.De ectionoftherailwaytrack(v¼70msÀ1,stiffnessratio¼4).
Table2
Maximumde ectionofthetrack(absolutevalue).
Velocity(msÀ1)
20Stiffnessration2
4
8
2
4
8
2
4
8MEM(mm)0.90940.68670.50600.92250.69130.50920.92780.69510.5115Analyticalmethod(mm)0.91540.68480.50420.91850.68690.50560.92220.68930.5072

Difference(%)0.65550.27750.35700.43550.64060.71200.60720.84140.84785070
Fig.12.Verticaldisplacementpro leofthetrackatcontactpoint(stiffnessratio¼2).
midpointofthisportion.Thetwoendportionsofsuf cientlengthsarerequiredintheFEmodelinordertomitigatethearti cialboundaryeffectsduetotheloadmovinginthevicinityoftheboundaries.TakingadvantageoftheconvergencestudycarriedoutfortheMEMmodel,thelengthsoftheendportionsarebothtakenequalto17.5m.
Thedisplacementpro lesofthetrackatthecontactpointareshowninFig.12.Ascanbeseeninthe gure,theresultsobtainedusingtheFEMisnotasaccurateastheoneobtainedusingtheMEM,forthecasewhenbothmodelsemploythesameelementsize.Whena nermeshisadoptedfortheFEmodel,theresultmatcheswelltheoneobtainedbytheMEmodel.Notsurprisingly,thecomputationaltimerequiredforthere nedFEmodeltakestwotimeslongerthanthatneededfortheMEmodel.ItmaythereforebeconcludedthattheMEMismoreef cientcomparedwithFEMforthestudyofmovingloadproblems.
Notethatintheaforementionedcase,themaximumspeedofmovingloadisfarbelowthecriticalspeedofthesystem.Thus,waveradiationoccurringasaresultofthemovingloadtravelingacrossthetransitionpointishardly

noticeable.
Stochastic Seismic Response Analysis of Base-Isolated High-Rise Buildings ...Governing equations of motion for the isolation system && The governing ...
Frequency Response Analysis of Active Disturbance Rejection Based Control System_能源/化工_工程科技_专业资料。ADRC频域分析方面的重要参考文献。ADRC思想是基于...
Comparative Analysis on MIMO Antenna Configuration ...of view for the high-speed railway MIMO system.... the channel impulse response (CIR) at time t ...
system connected to the line plan, do real-time... the timely development of maintenance response, ...status quo of China's high-speed rail analysis....
system with time delay for high-speed railway vehicl_工学_高等教育_教育专区...Frequency response analysis and simulation results prove that the analysis of ...
University of Kentucky- Disaster Prevetion of a High Speed Rail System 隐藏>> Disaster Prevention of a High Speed Rail System – Lessons learnt in a ...
Small-signal dynamic model and analysis of a fixed-speed wind farm - a...This approach utilizes the open-loop frequency response of the system to ...
A multi degree of freedom system has been ...high-speed rail (HSR), air passenger transport ...response determined using analysis tools (ANSYS). ...
according to mechanical system dynamics and ...response caused by the irregularity of the rail....Keywords: high-speed elevators, statics analysis,...
Ann Reg Sci (1997) 31:155–174 Justifying a high-speed rail project: ...(1987) suppose that an integral cost-benefit analysis of a HSR should ...
热门文档