文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 冶金/矿山/地质 > Response analysis of high-speed rail system
侵权投诉

Response analysis of high-speed rail system

2962K.K.Ang,J.Dai/JournalofSoundandVibration332(2013)2954–2970

Fig.11.De ectionoftherailwaytrack(v¼70msÀ1,stiffnessratio¼4).

Table2

Maximumde ectionofthetrack(absolutevalue).

Velocity(msÀ1)

20Stiffnessration2

4

8

2

4

8

2

4

8MEM(mm)0.90940.68670.50600.92250.69130.50920.92780.69510.5115Analyticalmethod(mm)0.91540.68480.50420.91850.68690.50560.92220.68930.5072

Response analysis of high-speed rail system

Difference(%)0.65550.27750.35700.43550.64060.71200.60720.84140.84785070

Fig.12.Verticaldisplacementpro leofthetrackatcontactpoint(stiffnessratio¼2).

midpointofthisportion.Thetwoendportionsofsuf cientlengthsarerequiredintheFEmodelinordertomitigatethearti cialboundaryeffectsduetotheloadmovinginthevicinityoftheboundaries.TakingadvantageoftheconvergencestudycarriedoutfortheMEMmodel,thelengthsoftheendportionsarebothtakenequalto17.5m.

Thedisplacementpro lesofthetrackatthecontactpointareshowninFig.12.Ascanbeseeninthe gure,theresultsobtainedusingtheFEMisnotasaccurateastheoneobtainedusingtheMEM,forthecasewhenbothmodelsemploythesameelementsize.Whena nermeshisadoptedfortheFEmodel,theresultmatcheswelltheoneobtainedbytheMEmodel.Notsurprisingly,thecomputationaltimerequiredforthere nedFEmodeltakestwotimeslongerthanthatneededfortheMEmodel.ItmaythereforebeconcludedthattheMEMismoreef cientcomparedwithFEMforthestudyofmovingloadproblems.

Notethatintheaforementionedcase,themaximumspeedofmovingloadisfarbelowthecriticalspeedofthesystem.Thus,waveradiationoccurringasaresultofthemovingloadtravelingacrossthetransitionpointishardly

Response analysis of high-speed rail system

noticeable.

上一页第9页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email