文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 冶金/矿山/地质 > Response analysis of high-speed rail system
侵权投诉

Response analysis of high-speed rail system

K.K.Ang,J.Dai/JournalofSoundandVibration332(2013)2954–29702963

Table3

Parametersforthesecondcomparison.

Parameter

Massperunitlengthoftrack

Secondmomentofinertia

Stiffnessoffoundation1

LengthoftruncatedrailValue119.87kgmÀ16.11Â10À5m4427Â103NmÀ2100mParameterYoung’smodulusoftrackMagnitudeoftheloadStiffnessoffoundation2LengthofabsorbinglayerValue2.1Â1011NmÀ2166.8Â103N854Â103NmÀ260

Response analysis of high-speed rail system

m

Fig.13.Displacementundermovingload(v¼180msÀ1).

Theuseofenergyabsorbinglayerstomitigatetheerroneousre ectionofwavesattheboundariesisalsonotessentialasthepropagatingwavesareexpectedtoattenuaterapidlywithinthedomainbeforetheyarriveattheboundaries.Tofurthertestthecapabilityoftheproposedprocedureofsolvingtransitionproblemsforthecasewherewaveradiationdue

´[5]forthecaseinwhichthespeedoftothetransitionpointismoresigni cant,theprobleminvestigatedbyDimitrovova

movingloadisclosetothecriticalspeedisanalyzed.Table3showstheparametersadoptedforthiscase.Asnophysicaldampingisconsidered,numericalinstabilityfacedbyadoptingstandardGalerkin’sapproacharisesduetothenegativedampingvaluecalculatedaccordingtoEq.(19).Themodi edTayler–Galerkin’sapproachadoptedbyKrenketal.[6]isthereforeemployedinordertoovercometheaforementionedinstabilityproblem.Fig.13comparesthedisplacementtime

´.Figs.14–16comparesthede ectionhistoryunderthemovingloadobtainedbythepresentstudyandbyDimitrovova

pro lesoftherailwhenthemovingloadislocatedat50m,1mbeforeand6mafterthetransitionpoint,respectively.Ascanbeseeninallthesecomparisons,goodagreementisattained.Theproposedprocedureisthusshowntobeeffectiveinsolvingtrack-transitionproblems.

3.2.Responseanalysiswithmovingsprung-massmodel

Themovingloadmodelisobviouslyasimplemodelofamovingtrain.Tocapturetheinertiaeffectofthemovingtrainmass,whichisnotaccountedforinthemovingloadmodel,thedynamicsofthetrain-tracksystemisnextinvestigatedusingthemovingsprung-massmodel.Theeffectoftrainspeed,trackirregularityaswellasfoundation’sstiffnessratioonthewheel-railinteractionisinvestigatedanddiscussed.Thetrackirregularitypro leadoptedinthisstudyhasamoderatewavelengthof1mtosimulatetrackcorrugationdefectsandweldimperfections.Newton–Raphson’smethod[21]isappliedtosolvethecontactequationofthewheelandrail.Inthisstudy,theparametersofthetrainmodelarethesameasthoserecommendedbyKohetal.[8].Thecontactparametersadoptedare:radiusofwheel,Rwheel¼460mm;radiusofrailhead,Rrailprof¼300mm;andPoisson’sratioofthewheelandtrackmaterial,u¼0.3.NotethatthesamelengthsoftruncatedrailandenergyabsorbinglayersasshowninTable3areemployedforthisanalysis.

Fig.17showsthecontactforcepro leatthetransitionregionforthecasewhentheamplitudeoftrackirregularityis0.2mmandspeedoftrainis70msÀ1.Ascanbeseen,themaximumcontactforceoccursshortlyafterthetransitionpoint.Itisalsoobservedthatwhenthestiffnessratiooffoundationequalsto4,thewheeljumpsthreetimesatlocationsbetween3mand6mafterpassingthetransitionpoint.Thisimpliesthatthe‘jumpingwheel’phenomenoncouldbetriggeredduetotheexistenceofatracktransition.Foralargestiffnessratioof8,the‘jumpingwheel’phenomenonisfoundtooccurafterthewheelpassesthetransitionpointandisobservedtobesustainedasthetraintravelsoverthesecondfoundation.Thus,itmaybeconcludedthatthestiffnessofafoundationisoneofthefactorthatcausestheoccurrenceofthe‘jumpingwheel’phenomenon.

上一页第10页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email