1708C.Greifenhagen,P.Lestuzzi/EngineeringStructures27(2005)

1703–1712
Fig.5.Loadinghistoryofspecimens,(a)M3,(b)M4.
yielduptothenominal exuralstrength[15,16].Both rstyieldandnominal exuralstrengtharederivedfrommoment–curvaturerelationshipsthatwerecomputedwiththematerialpropertiesshowninTables2and3.Theassumptionsforthesecalculationsincludeelastic–perfectlyplasticandparabolic–rectangularstress–strainrelationshipsforreinforcingsteelandconcrete,respectively.Dependingonthespecimencon guration,yieldingoftheoutermostrebarsoccurredbetween76%and82%ofthenominal exuralstrength.
Allspecimensapproximatelydevelopedthenominal exuralstrengthand,hence,theobservedmaximumbaseshearwascontrolledby exure,andnotbyprematureshearfailure.TheobservedmaximumbaseshearofspecimenM3isevengreaterthanthebaseshearatnominal exuralstrength.Thespecimensfailedduetoincreaseofapplieddisplacements.Theultimatedisplacementwasrestrictedbyshearfailureor exuralfailure,dependingontheaxialforceratiothatwasappliedonthespecimen.
ForspecimenM1,crackinglocalizedatthebaseofthewall.Behaviorthatwasalmostlinearelasticwasobserveduptoamagnitudeofbaseshearof150kNwhichisclosetothepredictedyieldingoftheoutermostrebars.Thentheslopeoftheresponsecurvechangessigni cantly.Displacementsupto3.5mmandaxialforceof136kNresultedinanumberofsmallinclinedcracksthatformedinazoneof40mmwidthbetweenthefootingandthe rststirrup.Theinclinedcrack(Fig.7)occurredat3.5mmtoplateraldisplacement.Reductionofaxialforceresultedindiminutionofstiffness.Thesmallcracksneartothebaseinterconnectedwithincreasesofdisplacementsand
slidingmovementsinthesecrackscontributedsubstantiallytothetoplateraldisplacements.Theruptureoftheoutermostrebarswasobservedatatoplateraldisplacementof16.5mm.Inaddition,theverticalforcewasnotconstantduringthetest.Itvariedbetween136and146kN,106and122kN,80and106kNfornominalaxialforcesof136kN,106kN,and86kN,respectively.
DuringthetestofspecimenM2,residualdisplacementswerealreadyobservedatavalueofbaseshearequalto150kN.AsforspecimenM1,theslopeoftheresponsecurvediminishedatthepredictedyieldoftheoutermostrebars.Reductioninstiffnessduetobothdiminutionofaxialforceandincreasingnumberofcycleswasalsoobserved.However,atthetoesofthewallthecrackingextendeduptoonethirdofthewallheight.Acontinuousbasecrackdidnotform.Theconcretecoverattheedgesspalledat5mmdisplacement.Themovementofthewallconsistedthenofslidingattheloadreversalandsubsequentrocking.Thetestwashaltedat15mmtoplateraldisplacementbecausetheverticaldisplacementsexceededthecapacityofthetestset-up.DuringthetestofspecimenM2,theverticalpost-tensioningforcevariedbetween136and144kN,106and112kN,75and108kNfornominalaxialforcesof136kN,106kN,and86kN,respectively.Themaximumaxialforcewasobservedatthepeakofthehalf-cycles.
SpecimenM3developeditsmaximumbaseshearof176kNat3.2mmtoplateraldisplacement.Atthistime,crackingwaslimitedtothelowestthirdofthewall.Smallverticalcracksoccurredatthebaseofthewallnearitsedges.Increasingthedisplacementto7mmresultedintheformationofadiagonalcornertocornercrack(Fig.7).Duetothecracking,therestoringforcedecreasedbynearly15%.Moreover,bothspallingoftheconcretecoveratthewalltoeandbucklingoftheoutermostrebarswasobservedatthebeginningofthecycleinwhichthediagonalcrackformed.Despitetheoccurrenceofthediagonalcrack,theshearcapacityofthespecimenwasstillgreaterthan80%ofthebaseshearatnominal exuralstrength.Theseconddiagonalcrackoccurredat8.7mmtoplateraldisplacementresultinginadropoftherestoringforceby30%.Inthelowestquarterofthewall,theverticalstrainattheedgeincreasedby6mm/m.ThecrackpatternatthisstageisshowninFig.7.Signi cantlossofshearcapacitywasobservedinthesubsequentcycles.Fig.8showstheedgeofspecimenM3at10mmtoplateraldisplacement,aftertheseconddiagonalcrackoccurred.SuddenconcretecrushingalongthebaseofthewallterminatedthetestofspecimenM3.
ThemaximumshearcapacityofspecimenM4wasobservedat2.8mmtoplateraldisplacement(Table4).ThecrackpatternatmaximumbaseshearwasverysimilartothatofspecimenM3butthehystereticloopsofspecimenM4aremorepinchedthanthoseoftheotherspecimens(Fig.6).Spallingoftheconcretecoveratthewalltoeswasobservedat4.9mmtoplateraldisplacement.Theoutermostverticalrebarsbuckledatthedisplacementlevelof7mm.Nevertheless,theshearcapacityatthesubsequent
Post-fire cyclic behavior of reinforced concrete shear walls_专业资料。JCetSuhUi.eho.211710—18.n.ot nvTen1(0o :1310 lD0I0.00/l1 ...
Dynamic Shear and Axial-... 10页 免费 Static cyclic tests on l... ... SHEAR CRACK CONTROL ON REINFORCED CONCRETE COLUMNBY LATELAL PRESTRESSING 钢筋...
Modeling of cyclic she... 暂无评价 8页 2下载券 Static cyclic tests on...tws.2006.08.002 wall is similar to that of reinforced concrete shear wall...
Static cyclic tests on l... 10页 2财富值 Shear strength of concre......designed to emulate monolithic cast-in-place reinforced concrete shear walls....
Static cyclic tests on... 10页 1下载券 Creep... concrete_shear_wall[1] 6页 免费 Creep and ...mitigation retrots for lightly reinforced CMU walls...
Static cyclic tests on l... 10页 2财富值 Effects of Moisture Cont......To account for the magnitude of the initial shear stress, the parameter α...
Lightly Reinforced Concrete BC Joint_建筑/土木_... which were tested under quasi-static cyclic load...Specimen AL2 The storey shear force versus ...
Reinforced Concrete Buildings with Shear walls Y.M...cyclic behavior of material can be properly ...SAP2000: Static and Dynamic Finite Element ...
REINFORCED CONCRETE BEAMS SUBJECTED TO LATERAL LOADS...shear deformations of masonry walls, regardless of...Static: lateral cyclic loads Manufacturing of units...
Based on low cyclic loading tests of seven 1:2...and reinforced recycled concrete under static loads...Shear capacity of reinforced concrete beams made ...
热门文档