文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 资格考试/认证 > 其它考试 > V-22 Osprey or Albatross
侵权投诉

V-22 Osprey or Albatross

and produced two aircraft in 1977. The XV-

15 flew in helicopter mode in May 1978 and

in airplane mode in July 1979. The prototype

XV-15s accumulated more than 800 hours of

testing, and they served as test beds for refin-

ing tilt-rotor concepts.6

History of the V-22 Program

In 1981 the Department of Defense began

the Joint Services Advanced Vertical Lift

Aircraft (JVX) Program—based in large part on

demonstration of the XV-15—that was intend-

ed to meet the needs of all four military ser-

vices for a vertical takeoff and landing aircraft.

The Army lost interest in the program because

of competing funding requirements for heli-

copters, perhaps portending the current

affordability questions associated with the V-

22. As a result of Army withdrawal, the Navy

became the lead service for the JVX program in

1982. In 1984 the JVX was designated the V-

22, and the secretary of the navy chose the

name “Osprey” for the new aircraft.

The objective of the V-22 program was to

develop and produce 913 tilt-rotor aircraft

for the Army, Navy, Marine Corps, and Air

Force. The plan was to achieve initial operat-

ing capability for the Marine Corps version in

1992. The following is a summary history

that highlights some of the important events

in the V-22 Osprey program.7

1986: The program entered full-scale

development (FSD) after review by the

Defense Systems Acquisition Review

Council, the predecessor of the current

Defense Acquisition Board (DAB). A

fixed-price contract for a joint service V-

22 was awarded to Bell/Boeing.

Bell/Boeing began preliminary design

studies on an anti-submarine warfare

variant of the V-22, the SV-22.

1987: The Army withdrew from its com-

mitment to procure the V-22. Bell/Boeing

conducted budgetary cost estimates for

the SV-22. Also, the company initiated a

feasibility study for a variant to transport

3civilian executives (the VV-22). The U.S.Special Operations Command wasformed and took over acquisition respon-sibility for the special operations vari- ant—the CV-22—from the Air Force.1989: A test flight of the first of sixplanned FSD prototype aircraft was con-ducted in March. Secretary of DefenseCheney canceled the V-22 program—cit-ing cost—in the fiscal year 1990 amendedbudget. Production was terminated, butCongress disagreed with Cheney’s deci- sion and continued to fund the V-22.1991: An FSD aircraft crashed in an acci-dent on vertical takeoff due to mis-wiring of flight control system rategyros. Prototype aircraft exceeded thespecified weight, resulting in failure tomeet several range and payload require-ments for the aircraft as specified by the Joint Services Operational Requirement.1992: A second FSD aircraft crashed dueto a fire during landing approach,resulting in seven deaths. The V-22 pro-gram moved from FSD to engineeringand manufacturing development (EMD).1993: The new Clinton administrationfavored the V-22 and the program wasfunded in the Five Year Defense Plan forthe first time in four years. The undersecretary of defense for acquisitionordered the program to continue as ajoint effort. Congress passed FY94defense authorization and appropria-tion bills, both with funds identified forthe continuation of the V-22 into pro-duction (the appropriations bill also added funds for restart of the CV-22).1994: The V-22 passed a JointRequirements Oversight Council review.The DAB formally approved the V-22 EMD program.1997: The first EMD aircraft underwenta test flight. The DAB authorized thefirst lot of aircraft for low-rate initialproduction (LRIP). Authority forapproval of further low-rate and full-rate production was delegated to the sec-The Army lostinterest in the JVXprogram becauseof competingfunding require-ments for heli-copters, perhapsportending thecurrent afford-ability questionsassociated withthe V-22.

上一页第3页

你可能喜欢

热门文档

相关文档

  • A future vehicle

    The LAMV uses one-fourth of the fuel per passenger mile used by the tilt-rotor V-22 Osprey or high performance helicopters. The LAMV's acquisition ...

  • A future vehicle

    The LAMV uses one-fourth of the fuel per passenger mile used by the tilt-rotor V-22 Osprey or high performance helicopters. The LAMV's acquisition ...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email