2014, N 3
DOI: 10.2478/lpts-2014-0016
RELIABILITY OF LATVIAN POWER SYSTEM’S 330 KV SUBSTATIONS
1
V. Nepomnyaschiy, J. Gerhards2, A. Mahnitko2, T. Lomane2
1
Russian Academy of Natural Sciences, Sankt-Petersburg, RUSSIA 2
Riga Technical University, Institute of Power Engineering,
1 Kronvalda Blvd., Riga, LV-1010, LATVIA
e-mail: mahno@eef.rtu.lv
Substation reliability is always a topical problem. The authors consi-der the techniques for reliability calculation based on logical-probabilistic approach to the evaluation of electrical substation switchgear schemes and equipment at emergency situations with disconnections of individual elements of the substation equipment or false operation of relay protection and automation devices. Based on the reliability analysis made for the 330kV substations of Latvian Electric Power System, recommendations are given concerning the reconstruction of switchgear schemes for some substations.
Keywords: electrical substation reliability, logical-probabilistic method.
1. INTRODUCTION
Electrical substation is one of the main objects of an electrical power system (EPS). The emergency disconnection of some units of a substation or failure and false operation of relay protection and automation (RPA) devices can lead to the shutdown of the whole substation, which would affect the reliability of EPS as a whole.
The evaluation of substation reliability is based on analysis of its electrical diagrams and of the impact of its emergency regimes on the operational reliability of the whole EPS [1-12]. The development of EPS and the renovation of its pri-mary and secondary equipment cause changes in the reliability factors of some substations and, as a result, of the whole EPS. Therefore, the reliability evaluation of existing substations is a topical problem of practical importance [1-8].
This article concerns the reliability of Latvian EPS 330 kV substations. The techniques for reliability evaluation rely upon the logical-probabilistic approach for substation switchgear schemes and equipment in the emergency event with disconnections of individual elements of a substation’s basic equipment or false operation of RPA [1]. Based on the results of study and on the probabilistic reliability estimates obtained for the substations, the recommendations are given for changing the switchgear diagrams at some of the substations.