2. METOD FOR RELIABILITY CALCULATION
The calculation of substation reliability is based on the logical-probabilistic approach, whose foundations have been developed in [1]. The essence of the method is as follows.
Based on the switchgear diagram of a substation, the numbers of high vol-tage transmission lines (HVTLs) and the numbers of substation transformers, the substation reliability diagram (SRD) is created. The SRD is a power supply con-ditional scheme of the substation study point (in this case a high voltage busbar), the procedure for the connection of diagram elements and their mutual influence on the operational reliability of the network study point. This diagram is a serial connection of groups with serial and parallel connections of components, so that the failure of each of these groups leads to the total loss of consumer’s power supply at the study point of network.
It is assumed that the group elements are connected consistently (in the sense of reliability) if the emergency or scheduled switching-off of any of these elements leads to the offline state of the entire group (for example, "circuit breaker - HVTL" or "transformer - circuit breaker" groups). It is also assumed that during the reco-very of a damaged element the other group elements retain a usable state. In the sense of reliability, the elements in the group are considered to be connected in parallel if the group becomes inoperative only at coincidence of downtime for all its constituent elements (for example, a two-busbar system, two adjacent circuit breakers in "one-and-a-half" diagram of switchgears, two or more transformers at the substation, etc.). In real substation diagrams more complex groups of elements with parallel-serial connection can be identified.
At SRD preparation for the investigated substation schemes it is necessary to select the events resulting in a partial or the total disruption of substation operation.
Such events include:
1. Failure or scheduled disconnection of one substation element (this can also be a group of elements with serial or parallel structure of their connections) or its switchgear diagram.
2. Failures of some elements during the emergency or planned downtimes of other elements of the substation diagram.
3. Failures with the development of accident of switching equipments included in the group of elements connected in parallel the disconnection of which leads to a partial or the total substation blackout.
4. Failures of network elements (except the switching equipment) lead to disconnection of adjacent elements (for example, in the presence of the "extended quadrilateral" switchgear diagram of a substation the failure of HVTL leads to switching-off the transformer connected to it).
In the substation reliability diagrams presented in Table 1 the following symbols were used:
LB (TB) is the symbol of Line Breaker (Transformer Breaker), which is taken into account in the reliability calculation for all types of failures and their respective interval of downtimes.