近海辅助船舶作业前检查表
Checklist for Support Vessel and Installation Operations 近海辅助船舶和海上设施作业检查表 Vessel/船舶: Date/日期: No 序号 1 2 3 4 5 6 7 5 6 7 8 Field installation/海上设施: Time/时间: Checks To Be Carried Out Before Entering 500m Safety Zone 船舶进入500米安全区域前必须进行的检查 Approval obtained from OIM of the offshore installations 设施经理已批准船舶进入500米安全区域 Sea/weather conditions acceptable for a safe operation 气象/海况是否适合将进行的作业 Limitations due to sea/weather condition 气象/海况对作业的限制条件 Safe direction of approach towards installation evaluated 船舶接近设施的方向和方法是否经过评估 Bridge and Engin room manned in accordance with requirements 驾驶台和机舱的人员是否按规定要求配置 Master and crew are sufficiently rested; 船长和船员充分休息 Deck crew are briefed and correctly dressed; 甲板作业人员已被告知所需进行的作业并正确穿着PPE Communication(external/interal) established 通讯(对外/对内)是否已经建立 No hot work/smoking on deck within 500m zone 500米区域内船舶禁止明火作业及在甲板上抽烟 Auto Pilot off 自动舵是否已转换成手操舵 All manoeuvring and steering gear systems tested including changeover between control positions,back up system and manoeuvring modes. 所有操纵设备和操舵系统是否测试,包括操纵位置、操纵模式的转换及应急/后 备系统等 Emergency manoeuvring system tested 应急操纵系统是否测试 Working side confirmed with installation 作业舷是否已和设施确认 Load operations (cargo, bulk, fluid) confirmed with installation 货物作业计划和程序(货物、散货、液体货)是否已和设施确认 Installation to confirm readiness for vessel arrival and operation (inclusive no overboard discharge) 设施是否已准备好船舶的靠泊和作业包括影响作业的舷外排放已关闭 Manoeuvring mode during the operation to be agreed. If DP mode DP checklist to be used in addition. 操纵模式已同意。DP模式需进行DP操作检查 On-going and/or planned acitivities within 500m zone confirmed between installation, vessel and ERRV (if in attendance) 500米区域内正在进行和/或者计划进行的活动是否被告知和确认 Status Yes/No 检查情况 是 否 Remark 备注
9 10 11 12
13
14
Checklist for Support Vessel and Installation Operations
近海辅助船舶和海上设施作业检查表
Vessel/船舶:Date/日期:Field installation/海上设施:Time/时间:

Checklist for Support ... 2页 1下载券 ...5. Construction Vessel Types and Installation ...are?certified?for?man‐riding operations,?as?is?...
This checklist is used by the Hardware Installation Team or its equivalent.... and support required upon notification of a disaster by the Operations ...
The lifting and hoisting of the platform staircase can only be started after the installation and alignment of platform support, hanging and suspension beam...
boiler, lift, compressive vessel, forklift, crane, etc. 特种设备许可证/...installation inspection records 用电安全检查记录 Safety officer certificate / ...
This support extends to giving continued attention to the security of chlorine handling operations. Chlorine Institute members are committed to adopting CI’s...
GEN013 Vessel Internal Audit Checklist 船舶内审...the Master necessary support as per the procedures...16.3.2 Personnel involved in cargo operations ...
BlackBerry_Enterprise_Service_10_version_10.1_Preinstallation_and_preupgrade...有关详细信息,请访问 support.microsoft.com 以阅读文章 2224981。 Web 服务器 ...
such as special shipboard operations Oil Record Book & SOPEP Are necessary...Did the company give the master necessary and sufficient support? Was the ...
8SF 5.0 installation_计算机软件及应用_IT/计算机_专业资料。Storage ...Volume Manager Support Operations (vxdiskadm): A menudriven, text-based ...
Note: Master's over‐riding authority, safe navigation, safe operations and...&?96B and?support?are?applied,?as?required Are?staff?aware?of?the?name...
热门文档