Checklist for Support Vessel and Installation Operations

近海辅助船舶作业前检查表

No 序号 1 2

Checks To Be Carried Out Before Departing Installation 船舶离开设施时的检查 Vessel to be manoeuvred well clear of Installation befor changing mode 船舶清楚离开设施后才可转换操纵模式或方式 All controls set to neutral position before changing mode 转换操纵时所有控制均应在空档位置

Status Yes/No 检查情况 是 否

Remark 备注

No 序号 1

FPSO-Specific Checklist 船舶靠泊FPSO需进行的检查 Risk Assessment of ALL operations is to be carried out prior to operations commencing. To be comp

leted by the Vessel Master, OIM and Crane Operator. 作业开始前,船舶船长,设施经理和吊车司机是否进行风险评估 FPSO to confirm its heading and that the heading will not alter or be altered during supply vessel operations FPSO的艏向是否已确认,作业过程中FPSO应及时通知作业船舶艏向的变化 OIM to confirm motion of the FPSO in current conditions, e.g.: FPSO Roll – Degrees FPSO Roll – Period FPSO Pitch – Degrees FPSO Heave – Metres FPSO经理应及时告知船舶FPSO的运动情况,如FPSO的横摇角度和周期、纵摇 情况及起伏情况等 A general exchange of information regarding the disposition of cargo to be offloaded to the FPSO and back loaded cargo to be received by the vessel. 所需卸上FPSO或装上作业船舶的货物情况是否已沟通 A general exchange of information regarding “hose work” to be conducted. This will include the method of lowering the hose to the vessel and available space for this to be carried out safely. Where practicable sufficient deck space must be available or be cleared so that the vessel crew have a safe area in which to handle the hose. “管子作业”情况是否已沟通,包括管子位置、长度、浮球、渗漏检查情况及所 需装卸的货物、数量情况等。 Confirmation from the Master to the crane operator of the location of the vessel’s “ safe havens” and where the deck crew will be working. 作业船舶船长跟吊车司机是否对船舶的靠泊位置进行确认 Information from the OIM as to any particular limitations on crane operations or special conditions affecting normal operation of the crane FPSO经理已告知船长克令吊的限制情况以及其它影响克令吊作业安全的情况

Status Yes/No 检查情况 是 否

Remark 备注

2

3

4

5

6

7

Remark: This checklist details checks and exchange of information to be carried out by the Master of the supply vessel (OSV) and the OIM (or his representative) of the FPSO. The list is in addition to any other checklists completed prior to entry into the 500-meter zone 备注:船舶靠泊FPSO作业时,除了必须完成船舶进入500米安全区域的检查表,船长、FPSO经理(或其代 表)还需进行上述另外的检查和信息沟通。

Checklist for Support Vessel and Installation Operations