31 62 00 - Driven Piles
SECTION 31 62 00
DRIVEN PILES
PART 1 - GENERAL
1.01 SECTION INCLUDES A. Pile Types B. Determination of Length C. Indicator Piles and Test Piles D. Axial Compression and Tension Load Tests E. Lateral Load Tests F. Dynamic Pile Testing G. Installation of Piles
1.02 MEASUREMENT AND PAYMENT A. General: Measurement and payment for driven piles will be either by the lump-sum method
or by the unit-price method as determined by the listing of the bid item for driven piles indicated in the Bid Schedule of the Bid Form.
B Lump Sum: If the Bid Schedule indicates a lump sum for driven piles, the lump-sum
method of measurement and payment will be in accordance with Section 01 20 00 - Price and Payment Procedures, Article 1.03.
C. Unit Price: If the Bid Schedule indicates a unit price for driven piles, the unit-price method
of measurement and payment will be as follows:
1. Measurement:
a. Furnishing of piles of designated lengths, including test piles/indicator piles,
delivered to the site, will be measured for payment by the linear foot for the full length of the pile.
b. Driving of piles, including designated test piles/indicator piles, will be measured
for payment as individual units (each), per each pile driven and accepted, regardless of pile length driven, tip elevation, or penetration. Driving of piles will include cutoffs. Cutoffs shall become the property of the Contractor and shall be removed from the site.
c. Load testing of test piles, axial compression and tension, lateral and dynamic
tests will be measured for payment per each test performed.
UFGS 31 62 1616 Steel H Piles_建筑/土木_工程科技_专业资料。UFGS 31 62...No reduction in price is required for piles driven shorter than the ...
driven piles 打入桩 bored piles 钻孔桩 jacked-down piles 静压桩 screw piles 螺旋桩 hydraulic jack 液压桩 312.Piles foundations 桩基础 concrete pile 混凝土...
Driven Precast Piles – Balmore Glasgow ? Diaphragm walls - Bulgari Hotel Knightsbridge / Crossrail Stations Opportunities For Crossrail 1km of Diaphragm Wall ...
For some reason, the team leader was driven by a strong force to go ...The whole team worked together; carefully they removed the piles of ruined ...
Development of residual forces in long driven piles in weathered soils[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133(10): 1216?...
Grouped foundations include groups of caissons, driven piles, drilled shafts,...[61,62] FHWA [57] Load test [47] [57] [57] [85] Load test [47...
Intheconventionalallowableofpile stress designapproachfordriven piles,thesafetyfactorishighlydependentfactors on theaccuracy be撕ngaa capacitydeterminationmethods....
- cased bore piles with casing driven directly through rotary head or ...5 37.0 41.0 50.0 58.0 62.0 46.0 51.5 62.0 72.0 77.0 5,7...
2.1 钻孔灌浆钢管桩 之所以将”drilled and grouted piles”译作 打入桩(grouted driven piles)两种新型桩形式, 油平台建设过程中,直径约1 m的桩在穿过约8 m ...
[edit] Pile foundation systems Foundations relying on driven piles often have groups of piles connected by a pile cap (a large concrete block into which...