文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 表格/模板 > 表格类模板 > API Spec 16A BOP Drill Through Equipment Checklist
侵权投诉

API Spec 16A BOP Drill Through Equipment Checklist

No. 7.1.30

Instructions A pressure at least equal to the rated working pressure of the preventer shall be applied and held below the closed ram or annular packing unit for a time period of not less than 10 minutes after stabilization. Variable bore rams shall be tested on the minimum and the maximum sizes for their range. Each blow out prevente

r equipped with a hydraulic ram locking system shall be pressure tested with the locking system engaged. The preventer shall be tested in accordance with API Spec 16 A chapter 7.5.8.7.1.3.1. and 7.5.8.7.1.3.2. after the rams are closed, the locks engaged and then all operating pressure(s) released.

Comments and recorded values

Standards and instructions API Spec 16A chapter 7.5.8.7.1.3.2 API Spec 16A chapter 7.5.8.7.3 API Spec 16A chapter 7.5.8.7.5

Rig's

7.1.31 7.1.32

Material requirements Metallic parts 7.1.33 A written manual specification shall be required for all metallic pressure containing or pressure controlling parts. The manufacturer's written specified requirements for metallic materials shall define the following; a. Material composition with tolerance b. Material qualification c. Allowable melting practice(s) d. Forming practice(s) e. Heat treatment procedure including cycle type time and temperature with tolerances, heat treatment equipment and cooling media f. NDE requirements g.Mechanical property requirements API Spec 16A chapter 5.2.1

Non-metallic parts 7.1.34 Each manufacturer shall have written specifications for all elastomeric materials used in the production of drill through equipment. These specifications shall include the following physical test limits for acceptance and control: a. Hardness per ASTM D2240 or D1415 b. Normal stress-strain properties per ASTM D412 or D1414 c. Compression per ASTM D395 or D1414 d. Immersion test per ASTM D471 0r D1414 All repair welding shall be done in accordance with the manufacturer's written specification. All major repair welds performed subsequent to original heat treatment shall be mapped API Spec 16A chapter 5.2.2

Weld Repairs 7.1.35 API Spec 16A chapter 6.2.3.1

© ModuSpec Engineering (INT) BV

API Spec 16A

Page 5 of 9

API Spec 16A BOP Drill Through Equipment Checklist

上一页第5页

你可能喜欢

热门文档

相关文档

  • 钻井装置发证导则(20051212)[2]

    API Spec 16A/ISO13533 Drill-through Equipment API Spec 16C Choke and ...BOP 控制装置、立管系统、压力容器、电气系统和设备、提 升系统和设备是否根据...

  • 00-API LIST

    API SPEC 16A A 01 DEC 1997 Specification for Drill Through Equipment Second Edition API SPEC 16C A 1993 Specification for Choke and Kill Systems API ...

  • 钻井装置发证指南(2006)

    API Spec 16A/ISO13533 Drill-through Equipment API Spec 16C Choke and ...(6)用于 BOP 应急控制的蓄电池包括安装、布置以及设置部位的详细情况;包括充电 ...

  • API标准翻译清单

    Spec Q1/ISO TS 29001 Spec 4F Spec 5CT/ISO11960 ANSI/API Spec 5DP Spec... and Pumping Tees Specification for Pumping Units Drill Through Equipment / ...

  • Monogram_Product_Specs

    API Monogram Program Product Specifications API Spec 1B API Spec 2B API ...Drill Through Equipment – Rotating Control Devices Subsea Wellhead and ...

  • API Spec 7 Rotary Drill Stem Elements 1998

    API Spec 7 Rotary Drill Stem Elements 1998_能源/化工_工程科技_专业资料。API Spec 7 Rotary Drill Stem Elements 1998今日推荐 ...

  • D-002 System requirements well intervention equipment

    1, October 2000 API Spec 8C API Spec 9A API Spec 16A API Spec 16C ... Specification for Wire Rope Specification for Drill Through Equipment, (...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email