No.
Instructions
Comments and recorded values
Standards and instructions
Rig's
7.1.23
The hydrostatic proof test shall consist of three steps: a) the initial pressure-holding period of not less than 3 minutes. b) the reduction of the pressure to zero c) The second pressure-holding period of not less than 15 minutes The timing of the test shall not start until the test pressure has been stabilized within the manufacturer's specified range and the external surfaces have been thoroughly dried. The hydraulic operating chamber shall be tested at a minimum test pressure equal to 1.5 times the operating chambers rated working pressure. Each ram and annular blow out preventer shall be subjected to a closed preventer test after the hydraulic proof test. The hydraulic operating system pressure used shall be equal to or less than the manufacturer's specified operating pressure. The timing of all closed preventer tests shall not start until the test pressure has stabilised . Closed preventer tests shall be performed at low and high pressure with the low pressure tests always preceding the high pressure test A pressure of 200 to 300 psi shall be applied and held below the closed ram or annular packing unit for a time period of not less than 10 minutes after stabilization
API Spec 16A chapter 7.5.8.6.4
7.1.24
API Spec 16A chapter 7.5.8.6.4.1
Hydraulic Operating Chamber Test 7.1.25 API Spec 16A chapter 7.5.8.6.3.2
Closed Preventer Test 7.1.26 API Spec 16A chapter 7.5.8.7.1.1
7.1.27 7.1.28 7.1.29
API Spec 16A chapter 7.5.8.7.1.2 API Spec 16A chapter 7.5.8.7.1.3 API Spec 16A chapter 7.5.8.7.1.3.1
© ModuSpec Engineering (INT) BV
API Spec 16A
Page 4 of 9

API Spec 16A/ISO13533 Drill-through Equipment API Spec 16C Choke and ...BOP 控制装置、立管系统、压力容器、电气系统和设备、提 升系统和设备是否根据...
API SPEC 16A A 01 DEC 1997 Specification for Drill Through Equipment Second Edition API SPEC 16C A 1993 Specification for Choke and Kill Systems API ...
API Spec 16A/ISO13533 Drill-through Equipment API Spec 16C Choke and ...(6)用于 BOP 应急控制的蓄电池包括安装、布置以及设置部位的详细情况;包括充电 ...
Spec Q1/ISO TS 29001 Spec 4F Spec 5CT/ISO11960 ANSI/API Spec 5DP Spec... and Pumping Tees Specification for Pumping Units Drill Through Equipment / ...
API Monogram Program Product Specifications API Spec 1B API Spec 2B API ...Drill Through Equipment – Rotating Control Devices Subsea Wellhead and ...
API Spec 7 Rotary Drill Stem Elements 1998_能源/化工_工程科技_专业资料。API Spec 7 Rotary Drill Stem Elements 1998今日推荐 ...
1, October 2000 API Spec 8C API Spec 9A API Spec 16A API Spec 16C ... Specification for Wire Rope Specification for Drill Through Equipment, (...
热门文档