文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 表格/模板 > 表格类模板 > API Spec 16A BOP Drill Through Equipment Checklist
侵权投诉

API Spec 16A BOP Drill Through Equipment Checklist

No.

Instructions

Comments and recorded values

Standards and instructions

Rig's

7.1.23

The hydrostatic proof test shall consist of three steps: a) the initial pressure-holding period of not less than 3 minutes. b) the reduction of the pressure to zero c) The second pressure-holding period of not less than 15 minutes The timing of the test shall not start until the test pressure has been stabilized within the manufacturer's specified range and the external surfaces have been thoroughly dried. The hydraulic operating chamber shall be tested at a minimum test pressure equal to 1.5 times the operating chambers rated working pressure. Each ram and annular blow out preventer shall be subjected to a closed preventer test after the hydraulic proof test. The hydraulic operating system pressure used shall be equal to or less than the manufacturer's specified operating pressure. The timing of all closed preventer tests shall not start until the test pressure has stabilised . Closed preventer tests shall be performed at low and high pressure with the low pressure tests always preceding the high pressure test A pressure of 200 to 300 psi shall be applied and held below the closed ram or annular packing unit for a time period of not less than 10 minutes after stabilization

API Spec 16A chapter 7.5.8.6.4

7.1.24

API Spec 16A chapter 7.5.8.6.4.1

Hydraulic Operating Chamber Test 7.1.25 API Spec 16A chapter 7.5.8.6.3.2

Closed Preventer Test 7.1.26 API Spec 16A chapter 7.5.8.7.1.1

7.1.27 7.1.28 7.1.29

API Spec 16A chapter 7.5.8.7.1.2 API Spec 16A chapter 7.5.8.7.1.3 API Spec 16A chapter 7.5.8.7.1.3.1

© ModuSpec Engineering (INT) BV

API Spec 16A

Page 4 of 9

API Spec 16A BOP Drill Through Equipment Checklist

上一页第4页

你可能喜欢

热门文档

相关文档

  • 钻井装置发证导则(20051212)[2]

    API Spec 16A/ISO13533 Drill-through Equipment API Spec 16C Choke and ...BOP 控制装置、立管系统、压力容器、电气系统和设备、提 升系统和设备是否根据...

  • 00-API LIST

    API SPEC 16A A 01 DEC 1997 Specification for Drill Through Equipment Second Edition API SPEC 16C A 1993 Specification for Choke and Kill Systems API ...

  • 钻井装置发证指南(2006)

    API Spec 16A/ISO13533 Drill-through Equipment API Spec 16C Choke and ...(6)用于 BOP 应急控制的蓄电池包括安装、布置以及设置部位的详细情况;包括充电 ...

  • API标准翻译清单

    Spec Q1/ISO TS 29001 Spec 4F Spec 5CT/ISO11960 ANSI/API Spec 5DP Spec... and Pumping Tees Specification for Pumping Units Drill Through Equipment / ...

  • Monogram_Product_Specs

    API Monogram Program Product Specifications API Spec 1B API Spec 2B API ...Drill Through Equipment – Rotating Control Devices Subsea Wellhead and ...

  • API Spec 7 Rotary Drill Stem Elements 1998

    API Spec 7 Rotary Drill Stem Elements 1998_能源/化工_工程科技_专业资料。API Spec 7 Rotary Drill Stem Elements 1998今日推荐 ...

  • D-002 System requirements well intervention equipment

    1, October 2000 API Spec 8C API Spec 9A API Spec 16A API Spec 16C ... Specification for Wire Rope Specification for Drill Through Equipment, (...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email