浅谈董箐水电站1#导流洞塌方体明挖处理的技术应用

浅谈董箐水电站1#导流洞塌方体明挖处理的技术应用

作者:徐汉宝

来源:《城市建设理论研究》2012年第30期

摘要:董箐水电站1#导流洞由于不良地质条件影响,在进口洞室开挖时围岩发生大规模的失稳坍塌,至使工程施工无法正常进行,为保证1#导流洞按期通水及整个水电站安全渡汛,在施工过程中参建各方对施工组织设计进行了多次讨论,最后决定采用明挖处理进行作业。结合施工实际情况,施工单位采用了切实可行施工方法,精心组织施工,最终较圆满的完成了1#导流洞塌方体开挖处理,按期完成了工程建设目标。

关键词:1#导流洞塌方体;明挖处理;施工;董箐水电站

Abstract: Dongqing Hydropower Station 1# Diversion Tunnel due to effect by poor geological conditions, lead to large-scale destabilization collapse when excavation of surrounding rocks in imported, to make engineering construction can not be normal, in order to ensure that 1# diversion tunnel on water and the whole power station safety during the flood season, the parties participating in the construction of the construction organization design discussions during the construction, finally decided to adopt the open-cut processing operations. This paper combined with the actual construction condition, construction unit to use the feasible construction methods, organize construction meticulously, eventually more successful completion of the 1# diversion tunnel collapse body excavation and treatment, to complete the project goal.

Key words: 1# diversion tunnel collapse body; the open-cut treatment; construction; Dongqing Hydropower Station

中图分类号:TV5文献标识码:A

1工程概述

1.1工程简介

董箐水电站位于贵州镇宁县与贞丰县交界的北盘江上,是一个以发电为主的水利枢纽,电站总装机容量720MW。电站枢纽由钢筋混凝土面板堆石坝、开敞式溢洪道、右岸放空洞、右岸引水系统、右岸岸边地面厂房和通航等建筑物组成。

工程选用断流围堰,隧洞导流方式,采用全年导流方案。共布置了1#、2#条导流洞,过流断面尺寸均为15×17m(宽×高)。导流洞断面型式为城门洞形,洞身采用钢筋混凝土衬砌,过流断面尺寸15×17m(宽×高),最大开挖断面为18.3×20.15m(宽×高),隧洞全长926.82m。