文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > ANTARES Status Report
侵权投诉

ANTARES Status Report

The ANTARES Collaboration is building a neutrino telescope 2400 m below the Mediterranean sea close to the Southern French coast. The site is already linked to the shore station by a 40 km-long electro-optical cable (EOC) which transmits power and data. A

3

determined with an accuracy of~ 1 ms. The present planning indicates that the full detector will be installed by 2005. From Nov. 1999 to June 2000 the Collaboration achieved a signi cant milestone in the deployment and operation of a“demonstrator line”, instrumented with

7 PMTs at a depth of 1100 m and connected to shore with a 37 km-long EOC. The shape of the atmospheric muon zenith angular distribution was reproduced, despite the small number of PMTs and their 1D-layout. The ANTARES relative and absolute positioning acoustic system of rangemeters, compasses and tilt miters was tested. Relative distances and absolute positioning were measured with an accuracy of~ 5 cm and of~ 1 m, respectively. In Oct. 2001, the 40 km-long EOC for power and data transmission between the detector and the shore station in La Seyne sur Mer was deployed. Since Dec. 9, 2002, the heart of the forthcoming array, the junction box (JB), has been in communication with the shore station. It was deployed during a sea operation requiring the dredging and lifting of 2.5 km of the undersea EOC. On March 17, 2003 the rst data were received from a prototype detection line equipped with 15 OMs (5 storeys corresponding to 1/5 of an ANTARES line). The line was deployed in Dec. 2002 and connected in Mar. 2003 to the underwater JB using the Nautile manned submarine of the French IFREMER oceanographic research agency. During the same mission, the Nautile connected a prototype instrumentation line (deployed on Feb. 12, 2003) incorporating instrumentation to monitor underwater environmental parameters (a pulsed laser calibration system, a deepsea Doppler current meter, detectors to measure sound velocity, salinity and water transparency). The success of the submarine connections has proved the viability of the nal detector con guration with 12 line inter-connections radiating from the JB. Data are currently being acquired from PMTs, tilt meters and compasses of the prototype line and from the instrumentation line. They are consistent with the expected single counting rate of around 60 kHz due to 40 Kβ decays and peaks in excess of 250 kHz from bioluminescence bursts. The status and results of the prototype lines are described in[4]. Fig. 1 shows the layout of the future 12 line detector and underwater photographs of the prototype lines. 2. Expected physics performances

The ANTARES angular resolution is about 0.2 for Eν> 10 TeV, where pointing accuracy is not limited by theν µ kinematics, but by the PMT TTS and by light scattering in water. The ANTARES sensitivity (90% c.l.) for pointlike source searches to the upgoingµ ux induced by a typical E 2 di erentialν ux is in the range between 4÷ 50· 10 16 cm 2 s 1 after 1 yr. Search strategies and discovery potential are discussed in[5]. The energy resolution and methods to reconstruct muon energy and parent neutrino spectra are discussed in[7]. The sensitivity (90% c.l.) to E 2 di use di erential neutrino uxes achieved by

上一页第3页

你可能喜欢

热门文档

相关文档

  • The ANTARES neutrino project status report

    The ANTARES neutrino project status report The ANTARES project aims to build a deep underwater Cherenkov neutrino telescope in the Mediterranean Sea. ...

  • Status_Report

    8页 免费 PYTHIA 8 Status Report 暂无评价 5页 免费 ANTARES Status Report 暂无评价 4页 免费 PVC status report 2页 免费喜欢此文档的还喜欢...

  • PYTHIA Status Report

    80页 8财富值 ANTARES Status Report 暂无评价 4页 免费喜欢此文档的还喜欢 Procurement Status Repor... 10页 5财富值 Renewables 2010 Global S... 80页 ...

  • PVC status report

    80页 8财富值 ANTARES Status Report 暂无评价 4页 免费喜欢此文档的还喜欢 employment and nurses’ ... 9页 免费 Protein Separation from ... 25页 免费...

  • Status of the ANTARES Project

    Status report (2006) o... 暂无评价 8页 免费 The ANTARES neutrino p... 暂无评价 7页 免费 1 Status of the PYTHIA... 2页 免费 Status of the ...

  • The DIPART project A status report

    The ANTARES neutrino pro... 暂无评价 7页 免费 Status report (2006) of ... 暂无评价 8页 免费 Status report of the Fin... 暂无评价 6页 免费 ...

  • Project Status Report

    Project Status Report Project Name: Department: Focus Area: Product/Process: Prepared By: Document Owner(s) Project/Organization Role Project Status Report ...

  • Status Report on the HELLAZ project

    The ANTARES neutrino pro... 暂无评价 7页 免费 Status report (2006) of ... 暂无评价 8页 免费 Status report of the Fin... 暂无评价 6页 免费 ...

  • Project Status Report

    Project Status Report_生产/经营管理_经管营销_专业资料。6-Sigma Project Status Report Project 登录日 ID 期 0001 0002 0003 0004 0005 0006 0007 0008 0009...

  • The CANGAROO-III Project Status report

    Status Report on the H... 暂无评价 10页 免费 The globus project A s... 14页 免费 The Grid Scheduling Pr... 暂无评价 15页 免费 The ANTARES ...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email