5.1.3 Action Plan, Implementation, and Observation
5.1.3.1 质量主管组织有关部门制定纠正措施,由相关部门实施。
5.1.3.1 Management representative should coordinate relevant departments to make corrective action plan, and relevant departments are responsible for action implementation.
5.1.3.2 质量主管组织人员对纠正措施效果进行验证,效果不理想的重新转入本程序5.1.2。
5.1.3.2 Management representative should coordinate staff to observe the results of the corrective action plan; if the result is below expectation, management representatives should start with procedure 5.1.2 again.
5.2 预防措施
5.2 Preventive Action
5.2.1 预防措施的提出
质量主管负责收集各类质量信息(如客户投诉意见、检验结果等),
必要时利用适当的统计技术对未来质量趋势进行预测,找出潜在不合格因素。
5.2.1 Preventive Action Plan
Management representative is responsible for collecting all sorts of quality information, such as defection review records, audit results, customer complaints, observation results, and making
quality trend forecast by using proper statistics mechanism to find out potential cause of unqualified items.
5.2.2 潜在不合格因素分析
潜在不合格可能由下列因素所引起:
5.2.2 Potential Cause Analysis
The potential defection could be caused by:
5.2.2.1 开工条件不满足,设计/规范不清;
5.2.2.1 Start-up requirements are not met. Design or criterion is not clear.
5.2.2.2 人员管理水平、生产技术不满足要求;
5.2.2.2 Personnel management level and production technology does not meet the requirements.
5.2.2.3 材料的品种、规格或(和)性能参数不满足要求;
5.2.2.3 The material variety, type or performance does not meet the requirements.
5.2.2.4 生产设备/测试仪器的欠缺或故障;
5.2.2.4 Company is lack of necessary production equipment or measuring instruments, or the equipment or measuring instrument is out of order.
5.2.2.5 自然条件的影响等。
5.2.2.5 Nature conditions.
5.2.3 预防措施的制定
质量主管组织相关部门通过对未来质量的预测和对潜在不合格原因的分析,做好记录,相关责 任部门针对具体的潜在不合格因素制定预防措施,并填写《纠正和预防措施表》。
5.2.3 Preventive Action Planning
Management representative should coordinate relevant departments to forecast future quality trend, analyze the defection cause, and make proper records. Relevant departments should take preventive actions, and fill Corrective and Preventive Action Plan.
5.2.4 预防措施的实施与跟进
5.2.4 Preventive Action Implementation and Follow-up Action
5.2.4.1 质量主管要求相应部门按计划实施,消除潜在不合格原因。
5.2.4.1 Management representative should request relevant departments to implement action plan
Corrective Action - 8D_计划/解决方案_办公应用_PPT专区。Problem Solving...Does the system preventive action address a large scale process in a ...
corrective action report改善报告 英文_英语学习_外语学习_教育专区。英文8D报告~供学习XYZ Engineering CORRECTIVE ACTION REPORT Used for resolving Customer ...
015-Corrective and preventive action procedure(R4)_预防医学_医药卫生_专业资料。 Corrective And Preventive Action Procedure DOC.No.: ZP11-1649 /1650/1651...
NABS-B60-4-02-02_Corrective_Action_Template_机械/仪表_工程科技_专业资料...Preventive Action 1 Prime Status Target/Due Date New Date Control/ ...
Supplier Corrective Action Request Process (8D)_初三数学_数学_初中教育_教育专区。SCAR,CAPASupplier Corrective Action Request Process (8D) SCAR Number NC ...
Corrective Action Request_调查/报告_表格/模板_应用文书。CAR-Corrective ... Verification of Corrective Action /Preventive Action 纠正/预防措施验证(并附...
Verify effectiveness of corrective action at next visit ___ 4. Effectivness of Corrective Action ? Accepted ? Not accepted (Raise new NCR & upgrade New...
Corrective ActionCorrective Action隐藏>> Corrective Action 8D Report Date:August 28 2003 范例: 范例: 事件事件 有抗焊现象” “SMT Re-flow后PCB pad有抗...
? ? ? ? Why not “Closed Loop Containment Action?” Why not “Closed Loop Preventive Action? What is the trade-off between preventive and corrective ...
Current Situation and Corrective Action on Disaster Management of China In our nation,natural disaster risk evaluation and management reserch are launched quite...
热门文档