BILL OF WORKS - AIR-CONDITIONING AND MECHANICAL VENTILATION
BILL OF WORKS - AIR-CONDITIONING & MECHANICAL VENTILATION Tenderer is required to fill in the prices below in full for the supply, delivery, installation, testing, commissioning and maintenance thereafter of the air-conditioning and mechanical ventilation (ACMV) for a period of twelve (12) months in accordance to this tender specifications and relevant drawings. Tender price in this section shall be on a basis of fixed lump sum for the proposed supply and installation as strictly per tender specifications and drawings, and Tenderer must assure completion and handover in complete functional and operatable system meeting specification. Tenderer must also fully understood the design, construction and operation requirement of this installation. Any technical issue, discrepancy or clarification required must be brought to the Engineer's attention prior to award of this tender. Tender prices shall be inclusive of all duties and taxes. Any alternative proposal shall be separated from this tender exercise and must carry good engineering ractice value with its technical specification and performance not less than tender specification, and also beneficial in long term operation. Item Description Amount (RM)
1.0
AIR-COOLED DIRECT EXPANSION UNITS (SPLIT UNITS) Supply and install 2 nos. 18,000 Btu/h ceiling suspended air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-1/1 & FCU-1/2) Supply and install 1 no. 18,000 Btu/h ceiling ducted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-1/3) Supply and install 1 nos. 10,000 Btu/h wall mounted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-1/4) Supply and install 1 no. 25,000 Btu/h ceiling suspended air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/1) Supply and install 1 no. 25,000 Btu/h ceiling cassette air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/2) Supply and install 1 no. 20,000 Btu/h ceiling ducted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/3) Supply and install 4 nos. 28,000 Btu/h ceiling suspended air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/4, FCU-2/5, FCU-2/6 & FCU2/7) Supply and install 1 no. 15,000 Btu/h wall mounted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-SH/1) Others not mentioned but deemed necessary or indicated in tender drawings: a) b) c)
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
Page 1 of 3
BILL OF WORKS - AIR-CONDITIONING & MECHANICAL VENTILATIONTenderer is required to fill in the prices below in full for the supply, delivery, installation, testing,
commissioning and maintenance thereafter of the air-conditioning and mechanical ventilation (ACMV) fora period of twelve (12) months in accordance to this tender specifications and relevant drawings.
Tender price in this section shall be on a basis of fixed lump sum for the proposed supply and installationas strictly per tender specifications and drawings, and Tenderer must assure completion and handover incomplete functional and operatable system meeting specification. Tenderer must also fully understood thedesign, construction and operation requirement of this installation. Any technical issue, discrepancy orclarification required must be brought to the Engineer's attention prior to award of this tender.
Tender prices shall be inclusive of all duties and taxes.
Any alternative proposal shall be separated from this tender exercise and must carry good engineering ractice value with its technical specification and performance not less than tender specification, and alsobeneficial in long term operation.

通风空调工程工程量清单_建筑/土木_工程科技_专业资料。通风空调工程工程量清单分部分项工程量清单工程名称:某综合楼电气安装工程 序号 项目编码 项目名称 (一)空调...
7通风空调工程工程量清单... 97页 免费 空调工程工程量清单与计... 12页 ...【附注】 1.玻璃挡水板安装参照钢板挡水板相关基价子目,其材料机械均乘以系数 ...
D.7 C.7.1 通风空调工程 通风及空调设备及部件制作安装。工程量清单项目、设置项目特征描述的内容、计量单位及工程量计算规则, 应按表 C.7.1 的规定执行。 ...
通风空调工程工程量清单项目设置及计价_建筑/土木_工程科技_专业资料。通风空调...排烟的部位包括着火区和疏散通道, 排烟方式包括自然排烟和机械排烟。 1、自然...
表2-8分部分项工程量清单分析表(通风空调)_XLS_建筑/土木_工程科技_专业...(元) 材料费 机械使 管理费 用费 103.12 46.07 56.64 0.04 0.37 484...
32通风空调工程量清单计价_机械/仪表_工程科技_专业资料。第三十二讲 通风空调...清单项目的设置(编码:030901001~030901013) C.9.1 通风及空调设备及部件制作...
冷冻机组站内的设备安装及管道安装,属机械设 备安装工程及工业管道工程;冷冻站外墙皮以外通 往通风空调设备的供热、供冷、供水等管道,属给 排水采暖燃气工程。 ? ...
第九章 通风空调工程工程量清单设置与计价_建筑/土木_工程科技_专业资料。第...超高增加费=制作安装人工费×15%+刷油人工费+刷油机械费)×30% =(18.84×...
冷冻机组站内的设备安装及管道安装,属机械设 备安装工程及工业管道工程;冷冻站外墙皮以外通 往通风空调设备的供热、供冷、供水等管道,属给 排水采暖燃气工程。 ? ...
通风空调工程工程量清单项目及工程量计算规则_建筑/土木_工程科技_专业资料。通风空调工程工程量清单项目及工程量计算规则,施工过程中定额中所包括的内容。...
热门文档