空调和机械通风部分工程量清单、Section 2d BOW - ACMV

BILL OF WORKS - AIR-CONDITIONING AND MECHANICAL VENTILATION

BILL OF WORKS - AIR-CONDITIONING & MECHANICAL VENTILATION Tenderer is required to fill in the prices below in full for the supply, delivery, installation, testing, commissioning and maintenance thereafter of the air-conditioning and mechanical ventilation (ACMV) for a period of twelve (12) months in accordance to this tender specifications and relevant drawings. Tender price in this section shall be on a basis of fixed lump sum for the proposed supply and installation as strictly per tender specifications and drawings, and Tenderer must assure completion and handover in complete functional and operatable system meeting specification. Tenderer must also fully understood the design, construction and operation requirement of this installation. Any technical issue, discrepancy or clarification required must be brought to the Engineer's attention prior to award of this tender. Tender prices shall be inclusive of all duties and taxes. Any alternative proposal shall be separated from this tender exercise and must carry good engineering ractice value with its technical specification and performance not less than tender specification, and also beneficial in long term operation. Item Description Amount (RM)

1.0

AIR-COOLED DIRECT EXPANSION UNITS (SPLIT UNITS) Supply and install 2 nos. 18,000 Btu/h ceiling suspended air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-1/1 & FCU-1/2) Supply and install 1 no. 18,000 Btu/h ceiling ducted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-1/3) Supply and install 1 nos. 10,000 Btu/h wall mounted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-1/4) Supply and install 1 no. 25,000 Btu/h ceiling suspended air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/1) Supply and install 1 no. 25,000 Btu/h ceiling cassette air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/2) Supply and install 1 no. 20,000 Btu/h ceiling ducted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/3) Supply and install 4 nos. 28,000 Btu/h ceiling suspended air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-2/4, FCU-2/5, FCU-2/6 & FCU2/7) Supply and install 1 no. 15,000 Btu/h wall mounted air-cooled split units c/w piping, insulation, refrigerant, brackets, control panel, wiring and necessary accessories (FCU-SH/1) Others not mentioned but deemed necessary or indicated in tender drawings: a) b) c)

1.1

1.2

1.3

1.4

1.5

1.6

1.7

1.8

1.9

Page 1 of 3

BILL OF WORKS - AIR-CONDITIONING & MECHANICAL VENTILATIONTenderer is required to fill in the prices below in full for the supply, delivery, installation, testing,

commissioning and maintenance thereafter of the air-conditioning and mechanical ventilation (ACMV) fora period of twelve (12) months in accordance to this tender specifications and relevant drawings.

Tender price in this section shall be on a basis of fixed lump sum for the proposed supply and installationas strictly per tender specifications and drawings, and Tenderer must assure completion and handover incomplete functional and operatable system meeting specification. Tenderer must also fully understood thedesign, construction and operation requirement of this installation. Any technical issue, discrepancy orclarification required must be brought to the Engineer's attention prior to award of this tender.

Tender prices shall be inclusive of all duties and taxes.

Any alternative proposal shall be separated from this tender exercise and must carry good engineering ractice value with its technical specification and performance not less than tender specification, and alsobeneficial in long term operation.

空调和机械通风部分工程量清单、Section 2d BOW - ACMV

第1页

你可能喜欢

  • 通风空调工程
  • 预算讲义
  • 空调预算
  • 模板工程监理细则
  • 通风空调安装
  • 工程量清单综合单价分析表
  • 工程量清单计价实例

热门文档

相关文档

  • 通风空调工程工程量清单

    通风空调工程工程量清单_建筑/土木_工程科技_专业资料。通风空调工程工程量清单分部分项工程量清单工程名称:某综合楼电气安装工程 序号 项目编码 项目名称 (一)空调...

  • 通风空调工程量清单指引

    7通风空调工程工程量清单... 97页 免费 空调工程工程量清单与计... 12页 ...【附注】 1.玻璃挡水板安装参照钢板挡水板相关基价子目,其材料机械均乘以系数 ...

  • 通风空调工程量清单计价规范

    D.7 C.7.1 通风空调工程 通风及空调设备及部件制作安装。工程量清单项目、设置项目特征描述的内容、计量单位及工程量计算规则, 应按表 C.7.1 的规定执行。 ...

  • 通风空调工程工程量清单项目设置及计价

    通风空调工程工程量清单项目设置及计价_建筑/土木_工程科技_专业资料。通风空调...排烟的部位包括着火区和疏散通道, 排烟方式包括自然排烟和机械排烟。 1、自然...

  • 表2-8分部分项工程量清单分析表(通风空调)_XLS

    表2-8分部分项工程量清单分析表(通风空调)_XLS_建筑/土木_工程科技_专业...(元) 材料费 机械使 管理费 用费 103.12 46.07 56.64 0.04 0.37 484...

  • 32通风空调工程量清单计价

    32通风空调工程量清单计价_机械/仪表_工程科技_专业资料。第三十二讲 通风空调...清单项目的设置(编码:030901001~030901013) C.9.1 通风及空调设备及部件制作...

  • 7通风空调工程工程量清单计价

    冷冻机组站内的设备安装及管道安装,属机械设 备安装工程及工业管道工程;冷冻站外墙皮以外通 往通风空调设备的供热、供冷、供水等管道,属给 排水采暖燃气工程。 ? ...

  • 第九章 通风空调工程工程量清单设置与计价

    第九章 通风空调工程工程量清单设置与计价_建筑/土木_工程科技_专业资料。第...超高增加费=制作安装人工费×15%+刷油人工费+刷油机械费)×30% =(18.84×...

  • 7通风空调工程工程量清单计价

    冷冻机组站内的设备安装及管道安装,属机械设 备安装工程及工业管道工程;冷冻站外墙皮以外通 往通风空调设备的供热、供冷、供水等管道,属给 排水采暖燃气工程。 ? ...

  • 通风空调工程工程量清单项目及工程量计算规则

    通风空调工程工程量清单项目及工程量计算规则_建筑/土木_工程科技_专业资料。通风空调工程工程量清单项目及工程量计算规则,施工过程中定额中所包括的内容。...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email