Procedia Engineering 95 ( 2014 ) 552 – 559
1877-7058 © 2014 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license
(doc.guandang.net).
Peer-review under responsibility of organizing committee of the 2nd International Conference on Sustainable Civil Engineering
Structures and Construction Materials 2014
doi: 10.1016/j.proeng.2014.12.216
ScienceDirect
Available online at doc.guandang.net
2nd International Conference on Sustainable Civil Engineering Structures and Construction Materials 2014 (SCESCM 2014)
The evaluation of constructability towards construction safety
(Case study: Kelok-9 Bridge project, West Sumatera)
Henny Yustisia *
Department of Civil Engineering, Padang State University, Padang 25134, Indonesia
Abstract
This study focuses on constructability terms of construction safety. Safety here is not only a occupational safety but within the
scope of the safety dimension that worker, property, environmental and public. The purpose of this study was to evaluate the
project constructability issues associated with Kelok-9 bridge construction safety problems and evaluate the implementation of
the project if the contractor can do the appropriate design and implement construction safety. From these results it can be
concluded: Constructability evaluation of the safety construction on the Kelok-9 bridge project quite good but design projects not
yet incorporate the experience and knowledge of the construction in terms of construction safety. © 2014 The Authors. Published by Elsevier Ltd.
Peer-review under responsibility of organizing committee of the 2nd International Conference on Sustainable Civil Engineering
Structures and Construction Materials 2014.
Keywords: Constructability; Safety; Bridge; Construction; Design
1. Introduction
On the positive competition in the world of professional construction services, many construction projects are
carried out with the traditional approach planning consultants and contractors contracted separately. A study of 61
consultant planners in Indonesia illustrates that 67% of the types of construction contracts signed is a traditional type
of contract [1]. Coupled with the circumstances in which the construction phase usually has a lag time for months or
even years in the planning phase. Contractors are usually not involved in the planning process until planning is
Kraft / Procedia Engineering 5 (2010) 512–515 513 514 B. Almutairi, M. Kraft / Procedia Engineering 5 (2010) 512–515 B. Almutairi, M. Kraft /...
Available online at www.sciencedirect.com Procedia Engineering 57 (2013) 1183 – 1191 11th International Conference on Modern Building Materials, Structures ...
Available online at www.sciencedirect.com Procedia Engineering 15 (2011) 1082 – 1087 A space-time network model based on improved genetic algorithm for ...
Jia Liu, Guangmin Sun, Dequn Zhao, Xu Yao, Yihang Zhang, MCU-Controlling Based Bluetooth Data Transferring System, Procedia Engineering, Volume 29, 2012,...
Procedia Engineering, 2011, 24: 412-416.(EI) [3] Depeng Chen, Chunlin Liu, Chunxiang Qian, Changwen Miao, Jiaping Liu. Hybrid Analytic-FEA Method ...
Available online at www.sciencedirect.com Procedia Engineering 00 (2011) 000–000 Procedia Engineering 28 (2012) 483 – 488 Procedia Engineering www.else...
Analysis and Control of Human Error Procedia Engineering, Volume 26, 2011, Pages 2126-2132 Shi Wenwen, Jiang Fuchuan, Zheng Qiang, Cui Jingjing Kunming ...
Available online at www.sciencedirect.com Procedia Engineering 43 (2012) 399 – 406 International Symposium on Safety Science and Engineering in China, 2012...
Procedia Engineering,2011,15:1662-1667. (三)SpringerLink 电子期刊 13. Wonik Park,Wonil Kim,Sanggil Kang,Hyunjin Lee,Young-Kuk Kim.Personalized Digital E...
Available online at www.sciencedirect.com Available online at www.sciencedirect.com Procedia Engineering www.elsevier.com/locate/procedia Procedia Engineering ...
热门文档