建筑电气外文翻译
tably alone divides the search coverage and installs the fire detector.
The electric cable shaft therefore is easy to form pulls out the smoke inflammation the channel; Has when the fire the fire intensity not easily extends along the electric cable burns, for this, "the high level civil construction design fire protection standard" and "the civil construction electricity design standard" separately proposes the detailed specific stipulation in the construction and in the electric wire or on the electric cable shaping. But considered implements specifically the difficulty and the present situation, the electric cable shaft installs the fire detector is extremely essential, and coordinates the shaft the fire protection separation request, each 2 ~ 3 or each level installs.
The elevator machine room should install the fire detector, its elevator is the important vertical transportation vehicle; Its two elevator machine room has has the fire risk; Its three lift well existence essential opens the hole, like the level gate opens between the hole, the air vent, the between permanence opens the hole with the elevator machine room or the pulley and so on; Its four when has the fire, the lift well often becomes the fire intensity spread the channel, is easy to threaten the elevator machine room the facility. Therefore, the elevator machine room establishes the fire detector is necessary, crown of also suitable establishment fire detector lift well.
2nd, the manual fire reports to the police the button establishment
(Including guards against in front of smoke stair hall in view of various floors front room in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to come in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, should report to the police the button first choice spot as the establishment manual fire. In addition, the room also should establish the manual fire to the common elevator in front of to report to the police the button.
In the public active place (including hall, hall, dining room, multi-purpose hall and so on) and the main thoroughfare and so on place, the personnel very is all centralized, and mainly disperses the channel. Therefore should report to the police the button in these public active places main access establishment manual fires; The manual fire establishes which in the main thoroughfare reports to the police the button to guarantee "to a manual fire which most is close to reports to the police the button distance from a fire protection district any position not to be supposed to be bigger than 30 meters".
3rd, the fire emergency broadcasts the speaker the establishment
The aisle, the hall, the dining room and so on the public place personnel very are all centralized, and mainly disperses the channel. Therefore should press in these public places "to a recent speaker distance is not bigger than 25 meters from a fi
同时,它应该是分层 的刚性,以允许执行的规则和限制,确保的居民建筑系统的安全。必 须解决这些矛盾的要求,通过设计一个新的架构,将系统中的所有代 理共享。 强大...
电气设计外文翻译--当今建筑电气设计的几个问题 暂无评价
建筑电气专业毕业设计英... 9页 免费 智能建筑外文翻译_secre... 29页 1下载券建筑电气工程毕业设计外文文...
卡普兰——谁给我提供了很多的背景信息的支持,为本文从收集的技术文件电气, 西... 电气外文文献及翻译 7页 免费 建筑电气专业毕业设计英... 9页 免费 建筑...
建筑电气设计毕业英文翻译_电力/水利_工程科技_专业资料。成绩: 西安建筑科技... 关于建筑电气消防的英文... 7页 免费 电气外文文献及翻译 7页 免费 建筑...
2011建筑学专业毕业设计外... 11页 免费 建筑电气工程毕业设计外文... 30页 2财富值 建筑外文文献(含中文翻译) 20页 免费 电气外文文献及翻译 7页 免费...
电气外文文献及翻译电气外文文献及翻译隐藏>> 浅谈高层建筑供配电系统设计摘要:随着城市规模的不断发展,高层建筑越来越多,因此,高层建筑电气设计 就成为设计者不得...
外文翻译 建筑电气 4页 2财富值 建筑电气专业毕业设计英文... 9页 免费 建筑电气设计毕业英文翻译 暂无评价 17页 20财富值 原文及翻译 1页 免费...
电气外文文献及翻译--开关电源设计_电力/水利_工程科技_专业资料 暂无评价
热门文档