GM_1927-06_Commodity_Key_Stakeholders_Meeting_Checklist,_January_2009

GM_1927-06_Commodity_Key_Stakeholders_Meeting_Checklist,_January_2009

Component/System Name: AP Number: Part Number(s): Program/Vehicle Line: Level of Supplier Integration

1. Technical Information

A. GM Design responsible: Supplier Integration Level I 1.1 Design FMEA completed by GM Engineering?

1.2 Have KCDS (GMW15049) items been identified by Engineering?

If No, will a KCDS Workshop planned?

1.3 Will drawings/SOR/SSTS/CTS and other technical information be sufficient to ensure

comparable quotes? Commodity Key Stakeholders Meeting Checklist

YES NO

Comments

B. Supplier Design Responsible: Supplier Integration Level II

1.4 Will preliminary KCDS (GMW15049) items be identified by Engineering? Sufficient? 1.5 Will approved SSTS/CTS/SOR and other technical documents be sufficient to ensure

comparable quotes?

1.6 Will preliminary A/D/V P&R plans (GM1829) be completed by Engineering

(Approved by GM)?

C. Supplier System/Design Responsible: Supplier Integration Level III & IV 1.7 Will preliminary KCDS (GMW15049) items be identified by Engineering? 1.8 Will the Statement of Requirements (SOR) be included and sufficient?

1.9 Will approved SSTS/CTS and other technical documents be sufficient to ensure

comparable quotes?

1.10 Will preliminary A/D/V P&R (GM1829) plans be completed by Engineering

(Approved By GM)?

2. Timing

2.1 Has the Buyer provided Program & sourcing timing (Pre-RFQ through Sourcing decision)?

2.2 Has Product Engineer provided development timing (Prototype, drawings, definition of

requirements etc.)?

2.3 Has SQE provided timing for quality requirements (GP-12, PPAP and Run @ Rate)?

3. Quality Expectations

3.1 Has the SQE verified that the Supplier Quality SOR (GM1927-3) and Part-Specific

Quality & Process SOR, if applicable, will be included in the RFQ? 3.2 Will the following requirements (if applicable) be included in the RFQ?

a-Tooling Standards, at SOR appendix N: 1-GMW15850 - Plastic Injection Molds, 2-VTSSD – Stamping Dies and 3-GVATDCS1 – Assembly Fixtures

b-Gage requirements, at SQ SOR:

1-GM1925 – Checking Fixtures 3.3 Have warranty targets been established? 3.4 Have functional tests been identified?

4. Bidders List

4.1 Do all suppliers on bidders list fulfill Quality Criteria?

4.2 Is PSA (Potential Supplier Assessment) or PCPA (Process Control Plan Audit)

required for any supplier?

4.4 New business hold list provided by Creativity Team?

January 25, 2009

1 of 2

GM 1927-6

第1页

你可能喜欢

热门文档

相关文档

  • GM_1927-43_Supplier_Launch_Audit,_January_2009

    GM_1927-43_Supplier_Launch_Audit,_January_2009_英语学习_外语学习_教育专区 暂无评价0人阅读0次下载举报文档 GM_1927-43_Supplier_Launch_Audit,_January_...

  • ...Break-Out_Questionnaire,_January_2009

    GM_1927-41_Supplier_Conference_Break-Out_Questionnaire,_January_2009_机械/仪表_工程科技_专业资料。GM PROJECT Global xxxxx READINESS STATUS Commodity: ...

  • GM 1927-06 Commodity Key Stakeholders Meeting Check...

    GM 1927-06 Commodity Key Stakeholders Meeting Checklist_机械/仪表_工程科技_专业资料。Commodity Key Stakeholders Meeting Checklist Component/System Name: Part...

  • GM_1927-23_Directed_Buy_Checklist

    Additional Comments: Complete the Checklist during the Commodity Key Stakeholders Meeting and review it during the Gate Review #1 (Kick-Off Meeting). ...

  • Ahlstrom Investor_presentation_2010

    Move from commodity papers to specialty papers ...Ahlstrom 2010 27 Key strategic challenges for ...(04/2010) 2% 2% 2% 12% Foreign holders ...

  • ...instructions (500917-001, January 2009) (c017121...

    HP StorageWorks MSA2312&2324fc Installation instructions (500917-001, January 2009) (c01712109)_IT/计算机_专业资料。HP StorageWorks MSA2312&2324fc ...

  • 2009key_to_bank_cloze

    2009key_to_bank_cloze。四级答案Bank Cloze 题型介绍: 题型介绍: 此题是试卷中的第四部分即阅读部分的 Section A. 是一篇约 250 字包含 10 个 空的文章。...

  • Form SS-4 (Rev January 2009)

    employment tax liability to be $1,000 or less in a full calendar year and want to file Form 944 annually instead of Forms 941 quarterly, check here...

  • key to unit 7

    key to unit 7_英语学习_外语学习_教育专区。外贸函电Key to unit 7 I. ...commodity according to the terms and conditions stipulated below : Commodity ...

  • leed体系09邻里社区核对表ND2009 checklist

    leed体系09邻里社区核对表ND2009 checklist_财务管理_经管营销_专业资料。LEED 2009 for Neighborhood Development Project Scorecard Project Name: Date: Yes ? No...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email