文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 高等教育 > 经济学 > 管理会计(英文版)课后习题答案(高等教育出版社)chapter 5
侵权投诉

管理会计(英文版)课后习题答案(高等教育出版社)chapter 5

Managerial Accounnting 7e (Don R.Hansen Maryanne M.Mowen) 管理会计(高等教育出版社) 于增彪(清华大学) 改编 余绪缨(厦门大学) 审校

order cost sheet). The more complicated your business becomes (e.g., mowing, trim-ming, fertilizing, trimming shrubbery, and planting shrubs and trees), the more source documents will be needed to keep track of time, materials, and use of capital equipment (e.g., trimmers and brushhogs).

The cost of a job is often strongly related to

the price charged. Logically enough, the higher the cost of the job, the higher the price charged to the customer. This relation-ship makes sense not only to the business but also to the customer. By comparing the cost of the individual job with the price charged, the firm can determine the profit at-tributable to each job. Then, the firm can de-cide whether the profit is sufficient to contin-ue offering the product or service under the current terms.

9. The principal difference between a manual

and an automated job-order costing system is the nature of the records. In an automated system, terminals can be used to input data directly to the job, thus eliminating the need for many of the source documents such as time tickets and requisition forms. Even if these forms are used and the data are en-tered on a batch basis, the job-order cost sheet has been replaced with an electronic record. Instead of cabinets with collections of job-order cost sheets, files are collections of job records located on disk or tape. 10. Materials requisition forms serve as the

source documents for posting materials usage and costs to individual jobs. Time or work tickets serve a similar function for la-bor. Predetermined overhead rates are used to assign overhead costs to individual jobs.

8.

上一页第2页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email