文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 建筑/土木 > 长江实时洪水预报系统
侵权投诉

长江实时洪水预报系统

长江实时洪水预报系统

Figure 2 6-hour cumulative precipitation forecasts on Yangtze River basin

3 Results

Some recent flood predictions have been chosen to demonstrate the products of QPF and flood forecasting within flood forecasting department work scope. The accuracy in terms of amplitude error for the peaks is assessed.

3.1 Quantitative precipitation forecasting

In the current FFS, meteorological simulation has provided QPF as the input for the hydrological model. Figure 2 shows the forecasts for 6 hour cumulative precipitation at Yangtze River Basin using MM5.

This quantitative result of the precipitation covering 6-48 hours (with 6 hour time step) is then provided in mm as ASCII file for hydrological models. However statistics analysis shows that the accuracy of the QPF using MM5 remains insufficient. Current efforts are being made on improving MM5 modelling accuracy for QPF.

3.2 Flood forecasting

Using the current system and QPF provided by the meteorological model, using the system presented in section 2, flood forecasting are made for gauging stations from Cuntan on discharge near Chongqing city, down to Yichang, Shashi, Zhicheng, Chenglingji (the mouth of DongTing lake), Luosan, Hankou and Datong on both discharges and water levels. Associated with the location of the station, lead time is in general 3 days for stations upstream of Zhicheng, and 5 days for downstream of Luosan (including Luosan). Figure 3 shows the flood forecasting for the flooding season in 2005 at Hankou station.

Figure 3 shows the 1-5 days water level forecast for the flood season in 2005 for Hankou station at Changjiang River. The average errors for 1-5 days are: 0.05m, 0.09m, 0.14m, 0.20m and 0.27m, respectively. The modeling system shows a robust and accurate flood forecast for Changjiang River in general.

4 Conclusions and discussions

Throughout the practice of its history, the current Changjiang flood forecasting system developed and implemented in BOH CWRC has provided accurate and efficient flood forecasting for flood management and control in Yangtze River basin, which gains significant social-economical benefit every year. Several characteristics that should be noted in the current FFS are:

1. Empirical method such as the co-relationship curves is widely used. The implementation of physically-based hydraulic model remains limited. The reason is: the physically-based deterministic hydrodynamic models require large amount of information, which is difficult to keep

上一页第14页

你可能喜欢

热门文档

相关文档

  • 实时洪水预报系统_第三章

    长江实时洪水预报系统 17页 免费实时洪水预报系统...2011-09-08 夏达忠 15 3.面雨量计算在进行实时洪水预报时,流域内某一区域的...

  • 实时洪水预报系统_第二章

    实时洪水预报系统_第三章... 暂无评价 34页 1下载券 长江实时洪水预报系统 17...第二章 水文自动测报系统 2011-09-08 夏达忠 1 本章主要内容 p p p p p...

  • 洪水预报实时系统组态设计

    实时洪水预报调度系统 暂无评价 1页 0.50 中国洪水预报系统设计建... 暂无评价 4页 2.00 长江实时洪水预报系统 17页 免费 实时洪水预报系统_第二章....

  • 南方中小水库实时洪水预报系统研究

    中山大学 硕士学位论文 南方中小水库实时洪水预报系统研究 姓名:曾彩华 申请学位...如1998年长江特大洪水,洪灾造成可用货币计算的直接 损失金额达1666.6亿元【1】;...

  • 【论文】长江洪水预报系统实施方案通过专家审查

    长江洪水预报系统实施方案通过专家审查_专业资料。日前,由长委防汛抗旱指挥系统工程...浅谈长江中下游实时洪水... 8人阅读 5页 2.00 长江流域气象-水文暴雨洪...

  • 洪水预报系统研究分析

    这种系统称为“联机实时预报系统” ,从 预报技术的角度看,比较第一代系统有了...国家“八五”攻关科研中,葛守西等主持开发研制的“长江专家交互式洪水预报系统”...

  • 【论文】实时洪水预报系统应用实例分析

    实时洪水预报系统应用实例分析_专业资料。针对山区多支流汇入河段的洪水特点,利用实时洪水预报软件系统和实时水雨情数据库技术,建立了受多支流汇入影响明显河段的洪水过程...

  • 【论文】基于SCS模型实时洪水预报系统的研究

    基于SCS模型实时洪水预报系统的研究_兵器/核科学_工程科技_专业资料 暂无评价

  • 【论文】实时洪水预报调度系统

    实时洪水预报调度系统_专业资料。随着经济社会的发展,我国洪涝灾害与水资源短缺问题并存,水库防洪调度现状不能适应经济社会发展的需求,防洪减灾非工程措施的作用日益重要...

  • 滩坑流域洪水预报及洪水调度系统运行分析

    滩坑流域洪水预报及洪水调度系统运行分析_天文/地理_自然科学_专业资料。龙源期刊...实时洪水预报调度系统 6人阅读 1页 0.50 水库洪水预报调度系统研... 11...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email