文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 能源/化工 > JOY薄煤层采煤机创纪录Mingo Logan’s JOY Longwall System Sets the Bar in Longwall Mining
侵权投诉

JOY薄煤层采煤机创纪录Mingo Logan’s JOY Longwall System Sets the Bar in Longwall Mining

JOY薄煤层采煤机创纪录Mingo Logan’s JOY Longwall System Sets the Bar in Longwall Mining

JOY薄煤层采煤机创纪录Mingo Logan’s JOY Longwall System Sets the Bar in Longwall Mining

28June 2009

Mingo Logan’s JOY Longwall System Sets

the Bar in Longwall Mining

F

Mingo Logan’s Mountain Laurel Longwall FaceMountain Laurel Shearer Operator Rocky Justice

port and feedback. As an operation,Mountain Laurel absolutely shinesin this. They always are open to newtechnologies and developments andthey do a great job by of working withour team of service, sales, produc-tion and engineering in order tomake such technological advancespossible.

“Currently,” he added, “we areworking with Mountain Laurel inbringing a surface link from a newlyacquired JOY continuous miner.Utilizing the FACEBOSS control sys-tem, we are able to display a wealthof information, including diagnos-tics. Both Joy and mine personnelare excited over the possibilitiesFACEBOSS technology presents, onthe longwall and beyond.”

According to Glenn Blankenship,Mountain Laurel LongwallMaintenance Coordinator, “Byincreasing the information madeavailable to our maintenance staff,we see a decrease in downtime byusing the advanced troubleshootingtechniques to our advantage. Theimproved user-friendly FACEBOSSscreens are easily navigated whileproviding us with on-board diagnos-tics.”

At Mountain Laurel, the JOY long-wall system is comprised of 176automated self-advancing 2X 1,040ton (945 tonne) shields with JOYRS20s electronic controls; a JOY7LS2A 4,000 volt, 800 plus hp (600kW) shearer— 711 hp (530 kW) cut-ter motors and 107 hp (80 kW)haulage motors—with a maximumcutting height of 11 feet (3.4metres), together with a JOYUltraTrac 2000 haulage system fea-turing 39 inch (1,000 mm) raceway

pans and l.7 inch (42 mm) flat-linkchain driven by a three 1,000 hp(745 kW) transmission with Joy’sexclusive turbo transmission tech-nology (TTT) couplings with flangedconnections.

The JOY 7LS2A shearer, normallyoperating at 45 fpm (15 mpm), iscapable of speeds up to 80-90 fpm(26-30 mpm), while the longwallconveyor system has a capacity of4,000 tons per hour (3,628 tonnesper hour). The JOY stageloader, withits 1.5 inch (38 mm) flat-link chain,has an operating capacity of 4,000tons per hour (3,628 tonnes perhour) and a surge capacity of 5,200tons per hour (4,717 tonnes perhour).

Upon completion of its secondpanel last year, the longwall shieldswere moved to a new 1,000 foot(305 metre) panel developed by JOY14CM15 and 12CM12 continuousminers. The JOY 7LS2A shearer, thearmored face conveyer and thestageloader went in for rebuild andwere replaced with new compo-nents, including the new 7LS2Ashearer equipped with the advancedFACEBOSS electronic control sys-tem.

Toler noted that the MountainLaurel installation was the first timein the U.S. where a complete long-wall mining system was designed,manufactured, delivered andinstalled under the JOY ProjectManagement Process (JOY PMP).“The goal of PMP,” Toler explained,“is to ensure major equipment man-ufacturing contracts are fulfilled on-time, on-budget, on-spec and to thesatisfaction of the customer, i.e.,that what was promised is what has

been delivered.

“Under this program, a dedicatedJoy Project Manager has the respon-sibility to oversee and coordinateevery facet of the design and manu-facturing process through to thedelivery, installation, start-up andtesting of the equipment under-ground,” Toler said. “He also directsthe implementation of support serv-ices, such as accounting, projectand quality control, shipping andlogistics, service engineering, appli-cation engineering, estimating, costengineering, supply chain, manufac-turing, controls and electronics andtechnical publications. During theentire process, the Project Manageroversees creation of a web-basethat, at the end of the project, thenbecomes the documentation. ForMountain Laurel, Joy’s ProjectManager is Nick Pekar.”

Jay Frye, Mountain LaurelLongwall Coordinator, offered: “Ourteam of experienced miners consis-tently have been and continue to beopen to the new advancements Joyhas to offer. Working together, wesee the benefits resulting in a saferwork environment, increased pro-duction and lower maintenancecosts.”

“In making a successful longwalloperation, Mountain Laurel’s man-agement credits a combination ofan already talented workforce, thequality and performance of the JOYlongwall equipment and itsadvanced technology,” Toler said.“The perfect storm of dedicated, tal-ented coal miners combined withthe world’s most advanced longwalltechnology.”

C

onsidered by many to be themost advanced single-manu-facturer longwall mining sys-tem in the world, the complete JOYlongwall system at Arch Coal’sMingo Logan Coal Company’sMountain Laurel Complex inSouthern West Virginia was criticalto the mine in achieving its goal ofdoubling production in a single year,according to Bryan Toler, Joy MiningMachinery Sales Engineer.

Begun as a “greenfield site” inSeptember 2005 with more than 50million tons (45 million tonnes) incoal reserves, Mountain Laurel’s JOYlongwall system went into produc-tion in October 2007. Currently, themine has more than 330 employeesand operates four development sec-tions and the longwall section in the7 foot (2.1 metre) Alma seam.

“Mine management had an estab-lished goal of increasing productionfrom 2 million tons (1.8 milliontonnes) in 2007 to more than 4.2million tons (3.8 million tonnes) ofclean coal in 2008 while averagingmore than 3,500 (3,175 tonnes) pershift,” Toler said. “In great measure,that achievement was due to the tal-ented people working at the minecoupled with the capabilities of thecomplete JOY longwall mining sys-tem.”

According to Toler, a key elementto the longwall system is the JOYFACEBOSS on-board control sys-tem. “There are a myriad of benefitsto the FACEBOSS control platform,”he said, “including improvedmachine monitoring, fault diagnos-tics, help text, and the expansion ofautomated cutting sequence capa-bility.“With this control and automationcapability, coupled with Joy’s RS20sroof support controls, the actualoperation of the longwall face ismade easier, safer, and healthier forboth the shield setters and sheareroperators,” Toler said. “Joy’sautomation and controls reducesthe exposure of these key people todust and noise generated by theshearer cutting the coal from theface.” At Mingo Logan’s MountainLaurel Complex, the typical longwallcrew consists of two shearer opera-tors, two shield operators, aheadgate person and one electri-cian.

“The sophistication of Joy tech-nology was further demonstrated ina recently completed project,”offered Joy ield ServiceRepresentative Danny LaRochelle.“Working with the folks at MountainLaurel, we successfully brought all

JOY薄煤层采煤机创纪录Mingo Logan’s JOY Longwall System Sets the Bar in Longwall Mining

the data from the face outside to themine control center on the surface.This involves all the data displayedfrom the FACEBOSS control system,including voltages, amps, and trend-ing information. Additionally, roofsupport data and armored face con-veyor information are displayed inreal time using the outby communi-cations system. With the FACEBOSSinterface, the information can bedisplayed on a variety of terminals,enabling both production and main-tenance managers to better planand react more quickly when issuesand events arise,” he said.

“An involved project of this naturealways requires extensive pre-plan-ning and coordination between allthe parties involved,” LaRochellesaid, “and the key to success is sup-

第1页

你可能喜欢

热门文档

相关文档

  • MG100BP型采煤机遥控操作规程

    MG100BP 型采煤机遥控操作规程 MG100BP 型采煤机近控时,采煤机操作人员必须通过在采煤机上面的操作手 把控制采煤机, 启动后人员必须离开采煤机, 发生事故后, 无法...

  • 【论文】液压牵引采煤机遥控装置

    七 台河 分公司 新兴 煤矿,龙江七 台河 龙黑140)560 摘 要 为 了对液压牵g采煤机实现远距离操控 ,l 新兴煤矿 自 设计 安装 了一套液压牵引采煤机遥控...

  • 基于数字调频技术的采煤机遥控系统设计

    基于数字调频技术的采煤机遥控系统设计_信息与通信_工程科技_专业资料。采煤机遥控器设计基于 数字调 频技 术的采 煤机 遥控系 统设计石 勇 天 地科 技股 ...

  • 左右端头及遥控器对采煤机的控制

    —牵电(牵引送电即给变频器送电) 1S15—牵断(牵引断电即给变频器断电) 在采煤机的两端,还有左右两个端头站上的控制按钮,和左右遥控器等四处 可以控制采煤机。...

  • 基于CC1000的采煤机遥控遥测装置设计 (1)

    15 ? 文章编号:1001—0874(2004)05—0015—03 基于CCl000的采煤机遥控遥测装置设计*谢子殿,朱秀 (黑龙江科技学院计笋机寺信息工程系,黑龙江哈尔滨150027)摘要: ...

  • 基于C8051F021的采煤机遥控系统设计和研究

    第39 卷 2011 年第 2 期 本栏目编辑 李文民 基于 C8051F021 的采煤机 遥控系统设计和研究江 帆1,李伟1,张传书1, 2 1 中国矿业大学机电工程学院 江苏徐州...

  • 基于uC_OS_嵌入式系统的采煤机遥控器设计

    第38 卷 2010 年第 9 期 基于 uC/ OS-II 嵌入式系统的 采煤机遥控器设计健 杨 本栏目编辑 郭卫* 张迎伟 赵栓峰西安科技大学机械工程学院 陕西西安 710054...

  • 基于CC1000的采煤机遥控遥测装置设计

    Keywords : CC1000 ; shearer ; telecont rol and telemetering ; operation station 1 引言 目前 , 采煤机遥控装置存在的主要缺点是控制 方式单一 ,只能局部显示...

  • 西门子采煤机无线电遥控装置

    西门子采煤机无线电遥控装置_机械/仪表_工程科技_专业资料。西门子采煤机无线电遥控装置西 门子 采煤机无线 电遥 控装置联 邦德国西门子 公司 最近研制出一种 ...

  • 采煤机司机操作流程及手指口述

    遥控器完好 遥控器 遥控器 遥控器电量足、 灵敏可靠, 确认 瓦斯报警 瓦斯报警 瓦斯浓度符合规定 瓦斯浓度符合安全规定,确认 仪仪 采煤机及周围有无 采煤机及采煤...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email