Packing general procedure

此文件对供应商送到立达及从立达发出的零件、产品和物料的包装方式提出了具体的规定。General requirements for packaging to be used to ship parts, products, and materials to and from Rieter Changzhou.
2. 术语和定义TERMS AND DEFINITIONS

所有的机器,分包装配件或零件发送时,必须有一份包装指导说明或样例图纸。(见SAP-BOM)。All machine, subassembly or part has to be sending, need there a proofed packing instruction or drawing. (See in SAP- BOM)
产品包装应根据产品的特点及储运条件采用不同的包装方法,产品包装应符合科学、经济、美观、牢固的要求。All packaging vary according to the types of products and transportation. And they must be suitable, economical, good-looking, and reliable.
包装必须适于直接用机器搬运(包装应与地面相距100mm)。It must be possible to lift the packaging directly with the handling machine (space between floor and packaging 100mm) .
装运必须安全,不允许包装对操作者或产品有潜在的危险。The load must be secured during transport. Any packaging representing a potential source of danger for the operators or for the parts is prohibited.
如果用户有特殊要求,包装遵从顾客具体要求进行。If customers have special requirements, the packaging is implemented according to customers.
1. General 概述 The purpose of this procedure is to define the method and requirement of marking, packing and shipping of fabricated structural steel for...
包装与运输程序-英中对照译文_能源/化工_工程科技_专业资料。PACKING & ...公司 ZHLNG-CWRQ-DOC-TRA-0001 PACKING & TRANSPORTATION PROCEDURE 1.General 1...
暂无评价 2页 1财富值 7.62.10 包装通用程序Pack... 暂无评价 17页 免费...GENERAL PROCEDURE 9 Run at Rate 过程三,评审结果 E. FAIL 质量,产能存在不...
Lens Hardcoating General procedure guideline_材料...Packing Send to storage 更新记录:Update history ... 7.62.10 包装通用程序Pa... 暂无评价 17页 ...
Procedure 4 Procedure 4.1 Disposal of general waste 4.1.1 Disposal of ...The used wooden-packing materials must be well collected and stored, by ...
packing technical requirements, encasement method, encasement procedure and ...《机电产品包装通用技术条件》 GB/T 13384-2008 General technical conditions of...
unit 2 general procedure Unit 6 quantity1/2 相关文档推荐 Unit 5 Packing... Unit 7 packing 64页 10财富值 Unit 7 Packing 商品的包装... 76页 8...
设备包装通用要求 Packing Requirements – General 附录 Appendices Page 3 of ...6. 程序 Procedure 6.1 包装要求 Packaging requirements 供应商必须做好产品的...
5.0 程序 Procedure: 5.1 文件分类、制定和审批 ...General Manager 一级 1 level 公司质量手册 Quality...包装作业指导书 Packing Instruction rd 3 level ...
The inspections specified in this Procedure are to...3.0 通用规则 General rules 3.1 检查依据 ... packing list, quality certificate, qualification ...
热门文档