文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 自然科学 > 数学 > 2013年美国大学生数学建模B题O奖
侵权投诉

2013年美国大学生数学建模B题O奖

Team Number

For office use only T1 ________________ T2 ________________ T3 ________________ T4 ________________

21185

Problem Chosen

For office use only

F1 ________________ F2 ________________ F3 ________________ F4 ________________

B

2013 Mathematical Contest in Modeling (MCM) Summary Sheet

Summary

There are mainly three water problems in China: too little water in northern and northwestern part; too much floods in southern part; and too dirty water produced by industry and agricultural pollutants.

In order to address problems above and provide a thirteen-year water strategy (2013-2025) for the leadership of China, we conclude five sub-problems and its solution in our paper: 1)Prediction of the supply and demand of water in a period of thirteen years based on historical data;2) Model building of national water storage and movement strategy to solve China’s uneven distribution of water in time and space; 3)Model designing of regional water de-salinization strategy to increase the total amount of available water;4)Model building of water conservation strategy, including regional water pollution treatment and national water-saving; 5)Long run cost-benefit analysis of four water strategies above and the discussion of the optimal combination of water strategies.

In first model, we choose the most appropriate Fitting Function. Using Grey Predicted Model, we can get the correlation degree between water consumption and population, industrial GDP and

agriculture output. Then we successfully finger out the water demand in 2025 is 6770 hundred million m^3 by using GM prediction. In our second model, we use CV (coefficient of Variation) and water supply pressure as the decision-making index and work out a water storage project list by using Goal Programming. Based on cost and benefits analysis, we build Minimum Spanning Tree to work out the optimal water transfer plan. That is, we should transfer water from Yangtze watershed to Yellow watershed and Hai watershed. Besides, we devise a local water transfer strategy. In the third model, we build a set of parameters to describe the degree of water purification demand of each city and successfully get the water de-salinization plant building scheme. In the fifth model, we do long run cost-benefit analysis of four water strategies above. We first analyze weights of economic, physical, environmental implications by using AHP (analytic hierarchy process). Then we use Neural Network Algorithm to classify the quality of each strategy and finally get a reasonable strategy evaluation model.

In the whole modeling process, we give full consideration to validity, feasibility and cost-efficiency of our model.

第1页

你可能喜欢

  • 趋势预测
  • 2012美国数学建模
  • 美国大学生数学建模竞赛论文
  • 一致性评价

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email