工程造价管理前沿(中英文对照)_secret

工程管理专业房地产经营与管理方向外文翻译

the stage of the project cost management investment projects is estimated an important basis for decision-making. It has a direct impact on national economic and financial analysis of the results of the reliability and accuracy. Because of this phase is the preliminary work of projects, the information cannot be fully, comparable works more or less that information accumulated relatively small, estimated inadequate and unscientific. Makes project cost management and cost workers is difficult at this stage do something.

The various stages of the project cost control in the decision-making phase project cost control. Right project planning phase of the cost, many owners have the wrong understanding that the lower the cost the better. Cost control is not a unilateral issue, and should be a number of factors, a combination of practical, comprehensive consideration. The construction project investment decision-making stage, the project's technical and

economic decision-making, Cost of the project after the completion of the project and the economic benefits, with a decisive role in project cost

control is an important stage, rationally define and control the direction of the project cost of accurate positioning and building Optimization guiding role.

In the decision-making phase of the most important is to do a good job feasibility study, the work is done well, returns on investment and can form a good proportion. Otherwise, invest more, less effective, resulting in loss of control and waste of investment.

At present, some of the projects planned the owners of departure from the subjective desires of a feasibility study on the lack of scientific proof. Feasibility Study untrue, false or engineering functions obtaining the approval of their superiors, actually put into the feasibility study will be awarded in the study for the project after the smooth functioning buried a lot of hidden problems, lead to insufficient follow-up funds for the project and

上一页第4页

你可能喜欢

  • 建筑工程造价管理
  • 水利水电工程造价管理
  • 施工阶段工程造价管理
  • 电力工程造价管理
  • 铁路工程造价管理
  • 自考工程造价管理

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email