工程造价管理前沿(中英文对照)_secret

工程管理专业房地产经营与管理方向外文翻译

the stage of the project cost management Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management authority, and so on.

With the historical process, after recovery, reform and development, formed a relatively complete budget estimate of quota management system. However, as the socialist market economic development, the system's many problems have also exposed. Generally speaking, the budget estimate is based on direct participation in the management of national economic

activity as a precondition. Enterprise is not the actual economic entities. Due to the characteristics of the planned economy, and, at the time under the conditions of productivity, will inevitably become a shortage in the economy.

In severe shortage of commodities under the conditions, as long as a certain level of investment, will be certain outputs. In this environment, the project planning and technical argumentation there can be no economic analysis. State control of the project cost constitute key factors equipment and materials prices, wages and taxes of artificial distribution. In this

relatively stable economic environment, the budget estimate for the system approved project cost, help the government to carry out investment plans to play a major role.

As the socialist market economic system established, requires us to predict project investment and control. In recent years, international

investment project developed to the requirements of prior pre-control and in

上一页第2页

你可能喜欢

  • 建筑工程造价管理
  • 水利水电工程造价管理
  • 施工阶段工程造价管理
  • 电力工程造价管理
  • 铁路工程造价管理
  • 自考工程造价管理

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email