吊装作业SOP Hoisting Standard Operating Procedure 吊装作业标准操作程序

Hoisting Standard Operating Procedure 吊装作业标准操作程序 详细程序 吊装安全操作

吊装作业SOP  Hoisting Standard Operating Procedure 吊装作业标准操作程序

④. Being close to ground staff during lifting transportation.

⑤. Equipment failure during lifting.

5.5

5.6 Slow start, slow stop by pressing the button half of the depth(the first gear). The driver must confirm no interference and join between each jib(crane) in flowing

line area before starting.

5.7

5.8 It is not allowed to use the limiter as a means of stopping. The driver must know the weight of the cargo before lifting; It is prohibit to test the

weight with overload protection.

5.9 Binding and hanging methods must comply with the standard instructions.

5.10 It is forbidden to make the cargo staying or going through the top of any personnel’s

head.

5.11 The cargo must be lifted 0.5-1 meter higher than the maximum height of the

equipments on the ground before reaching the lifting channel from the start point; then the cargo must be lowered to make it to the height of 0.5 meters from the ground when reaching the channel.

5.12 The driver must send an alarm signal continuously and drive through after the

personnel making way in case the hook or the cargo has to pass overhead of any person.

5.13 The cargo must be landed down to the gournd,platform or jigs slowly and

immediately;It forbids any person standing below the suspended cargo and keep the suspended cargo unattended.

5.14 It is allowed to hold the cargos only when the cargo is landed down within 1 meter

distance from the plane where the operator stands.

5.15 Any person is prohibited to move with the hook or the hanging cargos.

5.16 It is prohibit to lift one cargo together with two cranes cooperation.

5.17 The drivers must obey the “Ten non-lifting cases” strictly :

①. No lifting if command signal is not clear (two or more person coopration) or illegal

上一页第8页

你可能喜欢

  • 安全培训教材
  • 员工绩效考核表格
  • 生产车间5S管理
  • 年终绩效考核方案
  • 冲压安全培训
  • 工艺培训
  • 冲压安全操作规程
  • 电气作业标准

热门文档

相关文档

  • 003-吊装作业hoisting work JHA

    003-吊装作业hoisting work JHA_能源/化工_工程科技_专业资料。Shell STC ... 熟悉安全程序和规定,正确佩戴个人 PPE,持本人胸卡进出指定厂区; Lifting work ...

  • 海德宝行政办STANDARD OPERATING PROCEDURE

    Standard operating pro... 6页 免费 吊装作业SOP Hoisting ... 12页 2...Executive Office 行政办公室 Standard Operating Procedure 标准运作程序 STANDARD ...

  • 0363-2013吊装作业安全管理标准

    吊装作业安全管理标准 Safety management standards of hoisting 2013 – 11 – ...3.6 作业半径 operating radius 吊物中心的垂线与吊臂回转中心之间的水平距离。...

  • Standard Operating Procedure

    吊装作业SOP Hoisting St... 12页 5财富值 Software Testing 16页 免费 ... Standard Operating Procedure Standard Operating ProcedureStandard Operating Proce...

  • 0363-2013吊装作业安全管理标准

    吊装作业安全管理标准 Safety management standards of hoisting 2013 – 11 – ...3.6 作业半径 operating radius 吊物中心的垂线与吊臂回转中心之间的水平距离。...

  • Q SY TZ0363-2013吊装作业安全管理标准

    吊装作业安全管理标准 Safety management standards of hoisting 2013 – 11 – ...3.6 作业半径 operating radius 吊物中心的垂线与吊臂回转中心之间的水平距离。...

  • Standard Operating Procedure for Tracking Priority ...

    Standard operating proce... 6页 免费 吊装作业SOP Hoisting St... 12页 ...Wright LB-028-1.1 Standard Operating Procedure for Tracking Priority Projects...

  • Standard Operating Procedure for Using the DEP LIMS...

    吊装作业SOP Hoisting St... 12页 5财富值 XRD Standard Operating P... ... Standard Operating Procedure for Using the DEP LIMS Browser and Cost ...

  • 法液空吊装作业培训中英文双语版ALHZ HSE_training 009...

    to make sure it is in safe operating condition... as per the C-GS-10-10-1 procedure, the ...hoisting machinery must be made by a competent ...

  • 保卫安全操作规程

    山东普洛得邦 标准操作规程 STANDARD OPERATING PROCEDURE 页码:2-1 保安安全操作规程 文件编号:SOP.0023.00 替代:/ 生效日期:2013 年 12 月 12 日分发号: 一 ...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email