Hoisting Standard Operating Procedure 吊装作业标准操作程序 详细程序 吊装安全操作

7.1 Any rigging must be visual inspected for defects before each use by the user. Stop to
use defective ones immediately and report to the team lifting equipment leader.
7.2 HSE&S department execute the monthly inspection on all riggings.
7.3 Rigging must be used within the designed capacity, overload is prohibit.
7.4 Protection components must be used when lifiting with testile slings.
7.5 The rigging like lifting belts and chains must be checked fully stretch and average force
on slings by lifting trial before each use.
7.6 Overlapping or multi-layer winding is strictly prohibited. Knot or extend the lenth of the
rigging by knot is prohibited as well.
7.7 Don’t throw the rigging down from height after each use to avoid unexpected distortion,
collision injury and hitching.
7.8 Any replacement of the standard rigging accessories by other material is not allowed.
7.9 It must strictly follow the manufacturer's instructions for repair or replacement. Welding
or reparing by heating method is prohibited when the metal rigging crack or deform.
7.10 Rigging must be hung on the designated storage shelf after each use;Putting on the gound,
stacked or stack with pressure is not allowed in order to avoid mildew, insect bites and rust.
7.11 Rigging storage area is well ventilated, dry, away from heat sources (including fire and
welding) or long-term solar and UV radiation.
7.12 Wash with cold water or cleaning agents and dry it completely after the rigging used in
acidic or alkaline conditions.
7.13 Rigging which is special designed could be used to lift the specified goods only.
7.14 Shackle must be installed correctly to make the force distributed on its curves and pin.
It must not exceed 120 °during use.
(100% of capacity when vertical lifting; 75% of capacity when 45° or less lifting; 50% of capacity when 90° lfiting. )
7.15 Hook is used vertically only. Tip load,back load,side load, and nip load is forbidden.
003-吊装作业hoisting work JHA_能源/化工_工程科技_专业资料。Shell STC ... 熟悉安全程序和规定,正确佩戴个人 PPE,持本人胸卡进出指定厂区; Lifting work ...
Standard operating pro... 6页 免费 吊装作业SOP Hoisting ... 12页 2...Executive Office 行政办公室 Standard Operating Procedure 标准运作程序 STANDARD ...
吊装作业安全管理标准 Safety management standards of hoisting 2013 – 11 – ...3.6 作业半径 operating radius 吊物中心的垂线与吊臂回转中心之间的水平距离。...
吊装作业SOP Hoisting St... 12页 5财富值 Software Testing 16页 免费 ... Standard Operating Procedure Standard Operating ProcedureStandard Operating Proce...
吊装作业安全管理标准 Safety management standards of hoisting 2013 – 11 – ...3.6 作业半径 operating radius 吊物中心的垂线与吊臂回转中心之间的水平距离。...
吊装作业安全管理标准 Safety management standards of hoisting 2013 – 11 – ...3.6 作业半径 operating radius 吊物中心的垂线与吊臂回转中心之间的水平距离。...
Standard operating proce... 6页 免费 吊装作业SOP Hoisting St... 12页 ...Wright LB-028-1.1 Standard Operating Procedure for Tracking Priority Projects...
吊装作业SOP Hoisting St... 12页 5财富值 XRD Standard Operating P... ... Standard Operating Procedure for Using the DEP LIMS Browser and Cost ...
to make sure it is in safe operating condition... as per the C-GS-10-10-1 procedure, the ...hoisting machinery must be made by a competent ...
山东普洛得邦 标准操作规程 STANDARD OPERATING PROCEDURE 页码:2-1 保安安全操作规程 文件编号:SOP.0023.00 替代:/ 生效日期:2013 年 12 月 12 日分发号: 一 ...
热门文档