文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 高等教育 > 工学 > 土木工程毕业设计外文翻译原文+翻译(桥梁)
侵权投诉

土木工程毕业设计外文翻译原文+翻译(桥梁)

The bridge crack produced the reason to simply analyse

In recent years, the traffic capital construction of our province gets swift and violent development, all parts have built a large number of concrete bridges. In the course of building and using in the bridge, relevant to influence project quality lead of common occurrence report that bridge collapse even because the crack appears The concrete can be said to " often have illness coming on " while fracturing and " frequently-occurring disease ", often perplex bridge engineers and technicians. In fact , if take certain design and construction measure, a lot of cracks can be overcome and controlled. For strengthen understanding of concrete bridge crack further, is it prevent project from endanger larger crack to try one's best, this text make an more overall analysis , summary to concrete kind and reason of production , bridge of crack as much as possible, in order to design , construct and find out the feasible method which control the crack , get the result of taking precautions against Yu WeiRan.

Concrete bridge crack kind, origin cause of formation In fact, the origin cause of formation of the concrete structure crack is complicated and various, even many kinds of factors influence each other , but every crack has its one or several kinds of main reasons produced . The kind of the concrete bridge crack, on its reason to produce, can roughly divide several kinds as follows :

(1) load the crack caused Concrete in routine quiet .

Is it load to move and crack that produce claim to load the crack under the times of stress bridge, summing up has direct stress cracks , two kinds stress crack onces mainly. Direct stress crack refer to outside load direct crack that stress produce that cause. The reason why the crack produces is as follows, 1, Design the stage of calculating , does not calculate or leaks and calculates partly while calculating in structure; Calculate the model is unreasonable; The structure is supposed and accorded with by strength actually by strength ; Load and calculate or leak and calculate few; Internal force and matching the mistake in computation of muscle; Safety coefficient of structure is not enough. Do not consider the possibility that construct at the time of the structural design; It is insufficient to design the section; It is simply little and assigning the mistake for reinforcing bar to set

第1页

你可能喜欢

  • 土木工程专业
  • 道路工程翻译
  • 室内设计翻译
  • 桥梁设计
  • 工程设计方法
  • 土木工程的发展
  • 系统工程
  • 安徽工程大学土木工程

热门文档

相关文档

  • 土木工程毕业设计外文翻译

    外文文献翻译(土木工程类... 13页 免费 土木工程英语文献原文及... 8页 1... 山东建筑大学毕业设计外文文献及译文 中文译文: 中文译文: 不确定性桥梁车辆...

  • 桥梁工程毕业设计外文翻译及原文

    土木工程毕业设计外文翻... 16页 2下载券 外文翻译,桥梁毕业设计 30页 1...224 KSCE Journal of Civil Engineering 毕业设计——外文翻译 现存的大跨径桥梁...

  • 土木工程毕业设计外文翻译原文

    土木工程毕业设计外文翻译原文_工学_高等教育_教育专区 暂无评价0人阅读0次下载举报文档 土木工程毕业设计外文翻译原文_工学_高等教育_教育专区。土木工程毕业设计...

  • 土木工程毕业设计外文翻译

    毕业设计 外文资料翻译原文题目: Composite Box Girder Bridges 译文题目:院系名称: 学生姓名: 指导教师: 混合箱梁桥土木建筑学院 专业班级: 学 熊晓莉 土木工程 ...

  • 土木工程毕业设计外文翻译原文+翻译

    土木工程毕业设计外文翻... 16页 2下载券 土木工程英语文献原文及... 8页 1下载券土木工程毕业设计外文翻译...

  • 土木工程毕业设计外文翻译

    附录A 专业外文翻译原文 附录 A 专业外文翻译原文 附录 B 专业外文翻译译文 ...以上这三种针对轻质结构的方法已经引领我们进入了千头万绪的桥梁工程 之中。我们...

  • 桥梁设计外文翻译

    桥梁二00 九届土木工程(桥梁)专业毕业设计*外文翻译 西班牙灵魂位于西班牙 Zaragoz 埃布罗河上的标志性的混凝土拱桥,目前正在紧张施 工建设中。赫仑·罗素关于...

  • 土木外文翻译原文和译文

    土木外文翻译原文和译文_建筑/土木_工程科技_专业资料。重庆交通大学土木工程专业(隧道与城市轨道交通工程方向)毕业设计外文翻译 A convection-conduction model for ...

  • 土木工程毕业设计外文翻译

    土木工程毕业设计外文翻译_建筑/土木_工程科技_专业...H. Han 摘要 预应力混凝土框架结构通常被用在桥梁... 土木工程英语文献原文及... 8页 1下载券 土木...

  • 本科毕业设计桥梁外文翻译

    沈阳建筑大学毕业设计(论文) 附录一:中文翻译土木工程师 桥梁工程 156 2003 年...(论文) 附录二:翻译原文 Castle Bridge, Weston-Super-Mare, UK Castle Bridge...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email