文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 高等教育 > 工学 > 土木工程毕业设计外文翻译原文+翻译(桥梁)
侵权投诉

土木工程毕业设计外文翻译原文+翻译(桥梁)

Considering the creep characteristic of the concrete, the elastic mould amount of concrete should be considered rolling over and reducing when the internal force of the annual difference in temperature is calculated. 2, Rizhao. After being tanned by the sun by the sun to the side of bridge panel , the girder or the pier, temperature is obviously higher than other position, the temperature gradient is presented and distributed by the line shape . Because of restrain oneself function, cause part draw stress to be relatively heavy, the crack appears. Rizhao and following to is it cause structure common reason most , temperature of crack to lower the temperature suddenly 3, Lower the temperature suddenly. Fall heavy rain , cold air attack , sunset ,etc. can cause structure surface temperature suddenly dropped suddenly, but because inside temperature change relatively slow producing temperature gradient. Rizhao and lower the temperature internal force can adopt design specification or consult real bridge materials go on when calculating suddenly, concrete elastic mould amount does not consider converting into and reducing 4, Heat of hydration. Appear in the course of constructing, the large volume concrete (thickness exceeds 2. 0), after building because cement water send out heat, cause inside very much high temperature, the internal and external difference in temperature is too large, cause the surface to appear in the crack. Should according to actual conditions in constructing, is it choose heat of hydration low cement variety to try one's best, limit cement unit's consumption, reduce the aggregate and enter the temperature of the mould , reduce the internal and external difference in temperature, and lower the temperature slowly , can adopt the circulation cooling system to carry on the inside to dispel the heat in case of necessity, or adopt the thin layer and build it in succession in order to accelerate dispelling the heat. 5, The construction measure is improper at the time of steam maintenance or the winter construction , the concrete is sudden and cold and sudden and hot, internal and external temperature is uneven , apt to appear in the crack. 6, Prefabricate T roof beam horizontal baffle when the installation , prop up seat bury stencil plate with transfer flat stencil plate when welding in advance, if weld measure to be improper, iron pieces of nearby concrete easy to is it fracture to burn. Adopt electric heat piece draw law piece draw prestressing force at the component , prestressing force steel temperature can rise to 350 degrees Centigrade , the concrete

上一页第5页

你可能喜欢

  • 土木工程专业
  • 道路工程翻译
  • 室内设计翻译
  • 桥梁设计
  • 工程设计方法
  • 土木工程的发展
  • 系统工程
  • 安徽工程大学土木工程

热门文档

相关文档

  • 土木工程毕业设计外文翻译

    外文文献翻译(土木工程类... 13页 免费 土木工程英语文献原文及... 8页 1... 山东建筑大学毕业设计外文文献及译文 中文译文: 中文译文: 不确定性桥梁车辆...

  • 桥梁工程毕业设计外文翻译及原文

    土木工程毕业设计外文翻... 16页 2下载券 外文翻译,桥梁毕业设计 30页 1...224 KSCE Journal of Civil Engineering 毕业设计——外文翻译 现存的大跨径桥梁...

  • 土木工程毕业设计外文翻译原文

    土木工程毕业设计外文翻译原文_工学_高等教育_教育专区 暂无评价0人阅读0次下载举报文档 土木工程毕业设计外文翻译原文_工学_高等教育_教育专区。土木工程毕业设计...

  • 土木工程毕业设计外文翻译

    毕业设计 外文资料翻译原文题目: Composite Box Girder Bridges 译文题目:院系名称: 学生姓名: 指导教师: 混合箱梁桥土木建筑学院 专业班级: 学 熊晓莉 土木工程 ...

  • 土木工程毕业设计外文翻译原文+翻译

    土木工程毕业设计外文翻... 16页 2下载券 土木工程英语文献原文及... 8页 1下载券土木工程毕业设计外文翻译...

  • 土木工程毕业设计外文翻译

    附录A 专业外文翻译原文 附录 A 专业外文翻译原文 附录 B 专业外文翻译译文 ...以上这三种针对轻质结构的方法已经引领我们进入了千头万绪的桥梁工程 之中。我们...

  • 桥梁设计外文翻译

    桥梁二00 九届土木工程(桥梁)专业毕业设计*外文翻译 西班牙灵魂位于西班牙 Zaragoz 埃布罗河上的标志性的混凝土拱桥,目前正在紧张施 工建设中。赫仑·罗素关于...

  • 土木外文翻译原文和译文

    土木外文翻译原文和译文_建筑/土木_工程科技_专业资料。重庆交通大学土木工程专业(隧道与城市轨道交通工程方向)毕业设计外文翻译 A convection-conduction model for ...

  • 土木工程毕业设计外文翻译

    土木工程毕业设计外文翻译_建筑/土木_工程科技_专业...H. Han 摘要 预应力混凝土框架结构通常被用在桥梁... 土木工程英语文献原文及... 8页 1下载券 土木...

  • 本科毕业设计桥梁外文翻译

    沈阳建筑大学毕业设计(论文) 附录一:中文翻译土木工程师 桥梁工程 156 2003 年...(论文) 附录二:翻译原文 Castle Bridge, Weston-Super-Mare, UK Castle Bridge...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email