文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 交通运输 > Light Rail Transit - Future Opportunities and Changes
侵权投诉

Light Rail Transit - Future Opportunities and Changes

Transportation in the New Millennium4will continue to be researched and tested in order to use ground level and buried methodsof power distribution to avoid the need for an OCS.

Train Control and Signals

Communications-based train control (CBTC) is undergoing field trials. Today’s prototypeinstallations will lead to wider application of CBTC on LRT systems in coming years.Intelligent transportation systems will be prominent with features such as warning devicesfor at-grade crossings, managing LRT control center operations, and providing on-streettraffic signal priority.

Communications

Quantum leaps in computers and fiber-optic data transmission technologies will continueto reduce costs and expand the amount of management information available to LRT

operators. Automated, real-time train location will be common for LRT systems. All majorLRT stations will have real-time train arrival information to enhance the customer’s use ofthe system.

LRT REGULATORY CHANGES

The institutional and regulatory outlook for developing and operating LRT will be

different from the immediate past. Financing will continue as a paramount issue after 2000.Institutional Relationships

Institutional and regulatory changes will evolve in an ever-closer relationship, representingthe expected increasing regulation of light rail and the continuing competition fortransportation funding from all levels of government.

Design Opportunities

LRT design criteria typically represent the vision of the development and operating

organizations. As such, these criteria often reflect system specifications that are more likehigher-cost conventional heavy- or rapid-rail transit than the concept of a “modern

streetcar.” Even where lower cost LRT “starter” lines are built initially, grade separations,exclusive trackways within road rights-of-way, and systemwide “enhancements” toimprove safety, or operations, or both, will add capital and maintenance costs as LRTsystems expand.

Existing freight railroad corridors will continue as opportunities for new LRT lines.Fewer of these corridors will be available for exclusive LRT use; however, shared use andjoint operation with freight railroads will increase due to advances with communicationsand sensor equipment that will enhance safety by virtually ruling out the possibility of acollision.

Project Delivery

Project delivery mechanisms that may reduce the effective first costs, or distribute costs tothe governmental agency over a longer period of time, will continue to be a focus. Moredesign-build, design-build-maintain, and design-build-operate-maintain contracting bypublic agencies will be in evidence. These delivery mechanisms are a form of privatesector “front-end” financing and will continue.

上一页第4页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email