ISOM 351
Chapter 8 – Lean system
1) Kaizen is the Japanese term for continuous improvement.
a. True b. False
2) In a lean system, large inventories are not considered a type of waste, because they prevent operator wait times.
a. True b. False
3) Lean systems try to:
A) produce a product in anticipation of demand.
B) maximize the value added by of each of its activities.
C) organize production in large lots to minimize the number of setups.
D) reduce the labor content in all processes.
4) The just-in-time (JIT) system is a(n):
A) management system of people and procedures to fulfill all delivery deadlines.
B) production system of small-lot manufacturing to reduce work-in-process inventory.
C) materials management system for removing all inventories.
D) integrated system of managing resources, information, and decision processes to eliminate waste.
5) Regarding the Eight Types of Waste that must be eliminated to implement lean systems, excessive movement
and material handling of product between processes is part of which general waste category?
A) Motion
B) Transportation
C) Inappropriate Processing
D) Underutilization of Employees
6) Continuous improvement with lean systems:
A) involves navigating a ship over treacherous rocks.
B) requires periodically increasing lot sizes or workforce levels to uncover problems.
C) entails systematically stressing the system and focusing on problem areas.
D) focuses exclusively on internal operations without addressing relationships with customers and suppliers.
7) Companies using lean systems generally have:
A) many suppliers to ensure that material shortages never occur.
B) suppliers that are located nearby to decrease delivery lead time.
C) suppliers that are willing to accept short-term contracts.
D) suppliers who are low-cost producers.
8) Lean systems maintain inventory in small lot sizes because small lot sizes:
A) increase pipeline inventory, allowing the organization to buffer against demand uncertainties.
B) increase the quality level of the product.
C) enable schedules to use machine capacities more efficiently.
D) increase manufacturing lead time because of the increase in waiting time.
9) The goal of single-digit setups is to have a setup time:
A) of less than one shift.
热门文档