文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 建筑/土木 > 高速铁路道岔设计与铺设的几点建议
侵权投诉

高速铁路道岔设计与铺设的几点建议

RAILWAYCONSTRUCTIONTECHNOLOGY

No11,2005AbstractsandKeywords

Getanall2roundunderstandingofthestandardsystemfor

passengerdedicatedrailwayandestablishanewconceptofrailwayconstructionJinShouhua

Abstract Discussionsweremadeofprimaryprinciplesforun2derstandingofstandardofpassengerdedicatedrailways,particu2larlytechnicalstandardfortrackwork,subgradework,bridgework,andtunnelwork,etc.,asspecifiedinfivedesigncodes,namelyJingHuHighSpeedRailway,250km/hcatedRailway,200km/hPassengeray,2gerandFreightMixedofRailway.Specificonsvari2ousspecialties.

Keywords passengerrailway,constructionstandard,keytechnology,understanding

Constructionequipmentfortrackworkofpassengerdedica2tedrailwayZengZonggen

Abstract Adescriptionisgiventoideasforconstructionequip2mentforpassengerdedicatedrailwayaccordingtocharacteristicsoftrackworkandexperiencelearnedfromabroadandQinShenPassengerDedicatedRailwayinChina.Relevantrecommenda2tionswereraised.

Keywords passengerdedicatedrailway,trackconstruction,constructionequipment

RecommendationsondesignandlayingofturnoutsforhighspeedrailwayJiaZhiwu

Abstract Turnoutsaretheweakestpointoftrackstructureinhighspeedrailway,andarekeyequipmentcontrollingrunningspeedoftrains.Ananalysiswasmadeofexistingproblemsinde2sign,manufacture,andlayingofturnouts,andimprovemento2pinionsweregiven.

Keywords highspeedrailwayturnout,structuredesign,layingofturnouts,recommendation

Theexactitudepositionmethodfor2000tprefabricatedboxbeamonpiertopShenYangyun

Abstract Basedonthe2000tprefabricatedboxbeamerectionofDonghaiBridge,inthisarticle,theworkprincipleoftheslip2pageexactitudepositionequipmentonpiertopandexactitudepo2sitionmethodforlarge2scalememberssettingareintroduced.TheF4boardsetattemporarybearingbottomareadoptedtobetheslippingsurfaceforexactitudepositionequipment.Theplanepo2sitionofboxbeamonpiertopisadjustedbyleveljack.Boxbeamsettinghighnessiscontrolledeffectivelywithsteelsandjackpre2pressedbeforeused.Theequipmentisusedtoerectpo2sitionforlarge2scaleboxbeamandprecisionofitsplanepositionandhighnesscanmeetcompletelytheexpectationsthatcodeor2dain.

Keywords large2scaleboxbeam,erection,exactitudepositionAnalysisofstaticalanddynamicaltestoflargespanonetow2ercable2stayedbridge

ShiZhou,CaoFahui,PuQianhui

Abstract Testthedeflectionbeamandthetower,theofonthestressofthebeamandRiverBridge(onetowerunderstaticloads.Thetestre2thestructurehasenoughstiffnessandstrength.naturalvibrationofthestructureistested,andtheimpactofthepassingvehiclesisanalyzed.Andtheusesofresultsofstaticanddynamicaltestsindamagedetectionduringtheserviceperiodofthebridgeisanalyzed.

Keywords Cable2stayedbridge,statictest,dynamicaltest,naturalvibration,impact

AnalysisofthesurfacesettlementsduetoshieldtunnelingZhangHaibo,YinZongze,ZhuJungao

Abstract Thegroundsurfacesettlementsduetoearth2pressure2balanceshieldtunnelingwassimulatedusing32Dnonlinearfiniteelementprogram.Thoseinfluencefactorssuchasoverlaysoildepth,outsidediameterofthetunnel,cabinearthpressure,andthetailvoidswerestudied.Acalculationformulawasproposedbaseontheupperanalysis,thecomparisonbetweenthecalculat2edandmeasuredsurfacesettlementsinPearlLineofShanghaiMetrofromSouthPudongstationtoNanpuBridgestationprovedthereasonabilityandcredibilityoftheproposed.

Keywords metro,surfacesettlement,influencefactor,formulaApplicationofCFGpilesinthegroundconsolidationcon2structionsLvQin

Abstract Inthegroundswithlowercapacity,groundconsolida2tionbyCFGpilescanformcompositefoundation,notonlyim2provesoilcapacity,butalsoreducecostofconstructionandshortenworkterm,comparedwithotherconsolidatingmethods.Keywords groundconsolidation,CFGpiles,compositefoun2dation,groundcapacity,settlement

DiscussiononmanufacturingtechniqueofrailwaytracksleeperoflonglinepedestalXiaoHongzhang

Abstract Thispaperintroducesthecharacteristicofmanufac2turingtechniqueofrailwaytracksleeperwithamethodofflowingwatermachineandamethodoflonglinepedestalbyourcountrypresentcondition,elaboratingtheimportantpointoflonglinepedestaltechnologicaldesign,constructionmethod,quantitycontrolandthequantityexamination,puttingforwardtheim2provementsuggestiontotheexistentproblemsuggestion.

Keywords methodofpedestal,tracksleeper,manufacturingtechnique,quantitycontrol

上一页第3页

你可能喜欢

  • 高速铁路技术
  • 铁路施工方案
  • 铁路知识
  • 京沪高铁
  • 客运专线

热门文档

相关文档

  • 高速铁路道岔铺设

    高速铁路对道岔的铺设精度要求很高,技术标准非常严格,铺设难度大,传统的 普通道岔...(7)电务转换装置分右开道岔直股设计和侧股设计、 左开道岔直股设计和侧股...

  • 高速铁路道岔铺设

    铁路正式 通车 , 国随之进 入了" 我 高铁 时 道岔 各处几 何尺寸 均达 ... 侧 股设计 ,用 于安装 电务转换 设 备处 的 高速 道岔预铺 平台 ,利用...

  • 高速铁路道岔设计关键技术

    因此, 在设计、 制作、 运输、 铺设和维护过程中 营条件相适应的高速道岔平面...综上所述, 可得到以下几点主要结论: ( 1) 尖轨与基本轨切线相距 12 mm 的...

  • 中国高速铁路道岔设计

    中国高速铁路道岔设计_工学_高等教育_教育专区。铁路站场设计必备基本材料...… 铁路 京石 、石武 、哈大客运专线即将开始铺设 :直向30m/5k h、 蓦 ...

  • 【论文】京沪高速铁路路基上道岔板铺设及质量控制

    京沪高速铁路路基上道岔板铺设及质量控制_交通运输_工程科技_专业资料。铁156 道 建 筑 Railway Engineering 文章编 号:1003—1995(2013)06—...

  • 第六章 道岔铺设

    第六章 道岔铺设_建筑/土木_工程科技_专业资料。客运专线轨道工程篇(征求意见...突出的问题是既 有线路设计参数是否适用于高速铁路专线,由于高速列车在道岔尖端受...

  • 高速铁路道岔及区间渡线设计分析

    目前 各 国发 展与研制 的高 速铁路道岔基本 上分为两大类:类是适用于直向高速行车的 一道岔,我国近年来设计铺设 的提 速1、 如21 8号 l高速道岔 11辙叉...

  • 高速铁路道岔施工

    高速铁路道岔施工_建筑/土木_工程科技_专业资料。 ...按设计分解 经专用运输车运输至铺设地点,龙门吊吊装...及尖轨、导曲线、 可动心轨辙叉、辙叉基本轨几个...

  • 高速铁路道岔技术

    (6)曲线尖轨的长度一般都较长,少则 10 几米,长...或新型合成材料 岔枕,以及铺设枕式或板式无砟道岔... 高速铁路道岔设计关键技... 6页 1下载券 提高我...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email