文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 建筑/土木 > Ended March 31,2008 Head OfficeSumitomo Fudosan Ueno
侵权投诉

Ended March 31,2008 Head OfficeSumitomo Fudosan Ueno

Ended March 31,2008 Head OfficeSumitomo Fudosan Ueno

3. Projected Consolidated Results for the Fiscal Year ending March 31, 2009 (April 1, 2008 – March 31, 2009)

Net Sales......................................................................................Operating Income.........................................................................Ordinary Income...........................................................................Net Income ...................................................................................

Millions of Yen

Consolidated

48,000

3,700 3,600 2,000

Note: The projections shown above are prepared based on information available as of the issuing date of this report, and therefore the actual results may differ from the projected figures due to various unknown factors.

4. Overview of Business Performance

There was dramatic growth in the crawler crane market in 2007. In the North American market, our main market, there was strong demand for cranes as a result of investments for the construction of airports, roads and for energy-related facilities, although U.S. economic growth has been slowed due to the impact of the sub-prime loan issue, a decline in personal consumption, etc. In the Asia area, the shipbuilding industry was very active in Korea, with steady demand across Southeast Asia. In India, there was vigorous construction in infrastructure development supported by rapid economic growth, which led to strong demand in the crane market. In China, there has been growing demand for cranes, particularly for smaller lifting capacity models. The Middle East market was continuing strong demand due to large capital investment stemming from the abundant inflow of oil money. As for Japan, despite delays in construction projects brought about from revisions in the Building Standards Law, new crane demand has been expanded due to the increase in private-sector construction projects and the introduction of new models that replaced aged machines and complied with the new gas emission regulations.

In this situation, we increased the production capacity at our main plant, Nagoya Works, drastically to meet our customers requirements. In addition to this, we launched the new production facility for large crawler cranes at Saijo Office in Sumitomo Heavy Industries' Ehime Works Saijo Factory, (Saijo City, Ehime Prefecture) in July of last year.

As for overseas operations, we have implemented many business strategies in the various regions. In North America, we promoted sales particularly for the models complying with the Tier-3 gas emission regulations through cooperation with Link-Belt Construction Equipment Company in Kentucky, USA. As for the European region, we expanded sales and service activities including the Middle East, Russia, and Africa in cooperation with Hitachi Construction Machinery (Europe) N.V. In the Asian region, which has experienced sharp demand growth, our relationships with major distributors in each

上一页第2页

你可能喜欢

热门文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email