4.8.1 General Requirements
PART 4.8 ERECTION AND COMMISSIONING
4.8.1
4.8.1.1
GENERAL REQUIREMENTS
Scope of Work
The Bidder shall erect and commission all the equipment furnished by him as required by the Contract in accordance with the requirements specified herein.
The Works shall conform to the applicable requirements of governing codes and all Indonesian codes or regulations having jurisdiction.
The Bidder shall arrange the schedule of his work in every respect to meet the Contract Schedule.
The Bidder shall provide erection and commissioning procedures for all equipment furnished by him. These shall be submitted after Contract Award.
The Bidder shall furnish all erection tools, machinery, testing devices, expendable supplies, labor and labor supervision required and as necessary to properly erect and commission the equipment.
All workmanship shall be the best of its kind. All labour shall be performed by men skilled in their particular line of work and to the full satisfaction of the Owner. All of the Works shall be erected complete, ready for commercial operation and to the full satisfaction of the Owner.
4.8.1.2
General
WORK AND SUPERVISION
The erection and commissioning of all equipment shall be done under the guidance of the manufacturer's representative (as applicable) or in accordance with manufacturer's recommendations. The equipment shall be erected, set, leveled, aligned and completed in conformance with his direction and to his complete satisfaction before equipment is put into service. The manufacturer's representative shall also guide and direct the placing of the unit in successful operation by Owner's personnel.
The Bidder shall provide all Works and materials required for erection, assembly mounting, wiring, checking, testing and commissioning for all equipment, components, controls, instruments, accessories and
1.General_Requirements通用准则_机械/仪表_工程科技_专业资料。仅供参考AWS D1.1/D1.1M:2002 Structural Welding Code — Steel AWS D1.1/D1.1M:2002 An...
Storing benchmark results NIST – September 2006 4 NIST Security Automation Workshop 2006 2 XCCDF - 1.0, to 1.0, and Beyond General Requirements We ...
EN60335-1-1 (2000) General Requirements (Chinese)_信息与通信_工程科技_专业资料。安规EN 60335-1:2002 SAFETY OF HOUSEHOLD AND SIMILAR ELECTRICAL ...
Page 2 of 7 SPECIFICATION, GENERAL REQUIREMENTS 3. Bar Code Labeling. The bar code labeling requirements shall be in accordance with AIAG B-10 Trading ...
General Requirements for all Elliott School Bachelor of Arts Degrees (New Curriculum) Students following the new curriculum were: ? Admitted to GW as ...
2 2.1 Requirements General requirements Approval of first supply and changes according to VW 01155. Avoidance of hazardous substances according to VW 91101....
IEC 60204-1:1997, Safety of machinery – Electrical equipment of machines – Part 1: General requirements IEC 60204-11:2000, Safety of machinery – ...
EN 954-1—Safety of machinery—Safety-related parts of control systems—Part 1: General principles for design. EN 996—Piling equipment—Safety requirements...
Motor capacitors IEC 60320-1:1994, Appliance couplers for household and similar general purposes – Part 1: General requirements IEC 60320-2-3, Appliance ...
Motor capacitors IEC 60320-1:1994, Appliance couplers for household and similar general purposes – Part 1: General requirements IEC 60320-2-3, Appliance ...
热门文档