PFMEA作业指导书(中英文)
Process Failure Mode Effects and Analysis (PFMEA) Instructions 过程失效模式影响及后果分析( PFMEA)指导书 NOTE: Process FMEA's must be prepared for all programs (components, subassemblies and assemblies) where has full program design responsibility. (Refer to the AIAG FMEA Manual, VDA, etc, and AIAG APQP and Control Plan manual). 备注:所有具有完全设计责任的项目(零件、分总成和总成)都必须准备过程失效模式影响及后果分析。 (参考 AIAG 失效模式分析手册,VDA等,以及AIAD APQP和控制计划手册) PFMEA templates have been developed to support many products. Refer to these templates to aid in the development of new PFMEAs. 已经开发了许多DFMEA模板来支持很多产品。 开发新的DFMEA时参考这些模版。 PFMEA Templates PFMEA 模板 INSTRUCTIONS 指导书 : Process FMEA's are to be prepared using a cross funtional team and Customer specific requirements (i.e., AIAG Potential Failure Mode and Effects Analysis (FMEA) reference manual, or VDA, etc). 过程FMEA需要利用跨职能小组和客户具体要求来准备(客户要求如:AIAG潜在失效模式和影响分析(FMEA)手册,或VDA等) The cross-functional team should include 跨职能小组应包括: * Advance Manuf. Engineer (Champion) 前期制造工程师(负责人)......PFMEA from similar programs 类似项目的PFMEA, DFM&A input DFM&A输入 * Product Engineer 产品工程师 .................................DFA items for similar programs & DFMEA 类似项目的DFA项和DFMEA * Quality Engineer质量工程师 ....................................Past Problem History Roadmap form 过去问题历史路径表 * Adv. Manuf. Manager 前期制造经理..............................Historical Information 历史信息 Packaging Engineer 包装工程师 - Optional可选 Validation Engineer验证工程师 - Optional可选 Tooling Engineer模具工装工程师 - Optional可选 2. All operations affecting fit, function, durability, governmental regulations and safety must be identified and listed sequentially. 所有影响配合、功能,、耐久性、政府法规和安全性的装配操作必须被识别并按序列出。 Similar part FMEAs and PFMEA templates must be considered. 必须考虑相似零件的FMEA 和PFMEA 模板 "Prevention for future product" items from the Past Problem Hisotry Roadmap must be included in the PFMEA as applicable. Refer to the Phase 2 Procedure and Past Problem History Roadmap form. 来自过去的问题历史路径中的“未来产品的预防”必须将其列入可适用的PFMEA中。参考第二阶段程序和过去问题历史路径表。 Inputs to the PFMEA include the SOW, DFMEA, and Quality Roadmap. PFMEA输入包括SOW, DFMEA和质量路径 The causes must be described in terms of something that can be fixed or controlled. 原因必须根据某些可以固定或控制的事项来描述 The effects must consider the customer in terms of the subsequent
operation, assembly, and product. 影响必须在后续操作、装配和产品方面考虑客户 SC/CCs controlled in the product manufacturing process must be addressed via process or product controls by documenting product or process characteristic controls in the Current Process Detection column or Recommended Action column of the PFMEA form. 通过在PFMEA表格的当前过程检测或建议措施栏内的记录的过程和产品控制,在产品制造过程中控制重要特性/关键特性。 Where detection is the major factor, provisions must be made to control the cause prior to the next operation. 当检测是主要因素时,必须在流到下道工序前采取预防措施加以控制
1.
3. 4.
5.
6.
7.
8.
9.
10. Action plans to drive improvement on identifed high severity (9 or 10) and top RPN items are documented in the Recommended Action Column. Prioritization and selection of improvement actions are developed in accordance AIAG Potential Failure Mode and Effects Analysis (FMEA) reference manual, or VDA, etc. 在推荐措施栏中记录为了推动改善已确认的高严重度(9或10)和高风险登记事项的行动计划。优先权和改进措施必须按照AIAG 潜在失效模式和影响分析(FMEA) 参考手册或VDA等来开发。
11. The Director of Advanced Manufacturing and AME Manager review and verify the DFMEA meets requirements prior to each PLUS Gate Review using the Manufacturing Sign-off (MSO) form. Refer to the MSO form. 前期制造总监和前期制造经理用制造签发表格(MSO)审核和验证DFMEA在每个PLUS门审核之前达到要求。参考制造签发表格。 12. The SEVERITY, OCCURANCE and DETECTION numbers must be re-assessed and the Risk Priority Number, (RPN) re-calculated when corrective actions have been implemented and verified. 当整改措施实施并验证后, 必须重新评估严重度,发生频度和可探测度数值,并重新计算风险优先系数 (RPN)。 13. Failure modes with high SEVERITY must be reassessed when a process change is completed. 过程更改完成后,高严重度的失效模式必须重新评估。 14. Use the PFMEA Change Log to track revision levels, dates, description of changes, required supporting documents that need to be reviewed / modified in relation to changes. 用PFMEA更改记录来跟踪修订等级、日期、更改描述和与更改有关的需经审核/修改的支持文件 AE-PLUS-FR-13-CH / Rev 16 (01-October-2009) Johnson Controls, Inc. Confidential and Proprietary
Page 1 of 1
AE-PLUS-FR-13-CH / Rev 16
(01-October-2009)Process Failure Mode Effects and Analysis (PFMEA) Instructions过程失效模式影响及后果分析(PFMEA)指导书NOTE: Process FMEA's must be prepared for all programs (components, subassemblies and assemblies) where has full program design responsibility. (Refer to theAIAG FMEA Manual, VDA, etc, and AIAG APQP and Control Plan manual).备注:所有具有完全设计责任的项目(零件、分总成和总成)都必须准备过程失效模式影响及后果分析。 (参考 AIAG 失效模式分析手册,VDA等,以及AIADAPQP和控制计划手册)PFMEA templates have been developed to support many products. Refer to these templates to aid in the development of new PFMEAs.已经开发了许多DFMEA模板来支持很多产品。 开发新的DFMEA时参考这些模版。PFMEA Templates PFMEA 模板

1.2.3.4.5.6.7.8.9.10.11.12.13.14.Johnson Controls, Inc.Confidential and ProprietaryPage 1 of 1
PFMEA作业指导书(中英文)_企业管理_经管营销_专业资料。德信诚培训网 PFMEA 作业指导书 1 PURPOSE(目的) The purpose of this work instruction is to provide ...
5 职责 5.1 过程失效模式及后果分析(PFMEA)制定:技术部。 5.2 过程失效模式... PFMEA作业指导书 5页 1下载券 PFMEA作业指导书(中英文... 暂无评价 1页 ...
PFMEA作业指导书(中英文... 暂无评价 1页 8.00 PFMEA编制作业指导书 ...3.2 过程 FMEA(PFMEA) :简称 PFMEA,是由负责设计的工程师或工程师小组在产品...
PFMEA作业指导书_企业管理_经管营销_专业资料。德信诚培训网 PFMEA 作业指导书... PFMEA作业指导书(中英文... 277人阅读 9页 10.00 PFMEA记录(英文) ...
PFMEA作业指导书(中英文) 77人阅读 9页 10.00元 PFMEA编制作业指导书 964... 德信诚培训网 PFMEA 作业指导书 1 目的 确定与产品和过程相关的潜在失效模式和...
PFMEA作业指导书.A_电子/电路_工程科技_专业资料。作业指导书 PFMEA 作业指导... PFMEA作业指导书 5页 1下载券 PFMEA作业指导书(中英文... 暂无评价 1页 ...
PFMEA 作业指导书 范例 作业指导书--范例 范例!! 1 目的 通过过程潜在失效... PFMEA示例 8页 免费 PFMEA作业指导书 4页 免费 PFMEA作业指导书(中英文.....
PFMEA作业指导书(中英文) 暂无评价 9页 10.00元 PFMEA编制作业指导书 8页... PFMEA 作业指导书 XXX 公司工作文件 1 目的 1.1 通过过程潜在失效模式及后果...
PFMEA编制作业指导书_机械/仪表_工程科技_专业资料。PFMEA编制作业指导书... PFMEA作业指导书 4页 免费 PFMEA作业指导书(中英文... 暂无评价 1页 ...
冲压PFMEA中英文_人力资源管理_经管营销_专业资料。冲压 PFMEA中英文...储存搬运作业指导书 storage and move work instruction 2 Incoming Inspection ...
热门文档