文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 经管营销 > 企业管理 > Capability Mapping- supplier英文原稿
侵权投诉

Capability Mapping- supplier英文原稿

Place an "x" in the box next to corresponding score for each question Supplier Name: 1.0 Quality System 1.1 Quality Management 0 Supplier A

1.2

No reviews with management occur Irregular reviews of quality metrics including field returns with management occur with some coverage of 2 cycle time and on time deliveries Regular reviews of quality metrics including field returns with management occur with coverage of metrics 4 and actions plans for improvement of cycle time, on time delivery, and internal assessments. Trend charts are available, showing improvement over the last 12 months. ISO9001 or ISO9002 or QS9000 0 Has no plans, no accreditation 1 Working towards approval 2 Evaluation date confirmed and registrar identified 3 Approved or meets the requirements of ISO9001/ISO9002/QS9000 and has been accredited for less than 3 years, last external audit available with corrective actions. If certification is for ISO9001/9002:1994 standard, a plan is in place to obtain certification for the ISO9001/9002:2000 standard. Approved or meets the requirements of ISO9001/ISO9002/QS9000 and has been accredited for 3 or more years, last external audit available with corrective actions. If certification is for ISO9001/9002:1994 standard, a plan is in place to obtain certification for the ISO9001/9002:2000 standard.

Strengths: Opportunities: Other Notes:

Strengths: Opportunities: Other Notes:

4 1.3

1.4

Internal Auditing of Quality Procedure System No internal auditing exists 0 Auditing occurs, but there is no formal procedure 1 A formal procedure exists and is deployed 2 A formal procedure exists, audits are routinely scheduled and deployed, corrective actions taken and results 3 evident A formal procedure exists, audits are routinely scheduled and deployed, corrective actions taken and results 4 are achieved and reviewed with senior management Management Responsibilities No documentation exists for Responsibility / Authority 0 There is an organizational chart outlining Responsibilities, communicated to all employees 1 There is an organizational chart outlining Responsibilities included in the company quality manual 2 2 4 The responsibilities and authority of all department / functions clearly defined (especially quality function)

Strengths: Opportunities: Other Notes:

Strengths: Opportunities: Other Notes:

1.5

The responsibilities and authority of all department / functions clearly defined and mapped (i.e. a Responsibilities, Authority, and Informed Matrix; RAI) Quality System Software Tools No quality system software in use 0 Quality system software which records defect traceability and trends, is in use for some areas & data is 2 available for review within 24 hours 4 Quality system software which contains defect traceability and trends, is in use for all areas & is available on-line real-time. There is evidence that collected data has led to product / process improvements.

Strengths: Opportunities: Other Notes:

1.6

Product and Production docume

nt control No evidence of document control 0 Formal, controlled, documentation exists, non-conformances were observed 2 4 Formal, controlled documentation exists with change authority, NO non-conformances were observed

Strengths: Opportunities: Other Notes: Strengths: Opportunities: Other Notes: Strengths: Opportunities: Other Notes: Strengths: Opportunities: Other Notes: Strengths: Opportunities: Other Notes:

1.7

1.8

1.9

1.10

2.0 2.1

2.2

Customer Field Return Rate Does not measure 0 Measures return rate and has established improvement goals 2 Measures return rate, has established improvement goals, and improvement plans with demonstrated 4 results Failure Analysis (FA) Capability (Root Cause Material Analysis) None 0 Contracted out. A list of internally approved external FA facilities is available. 2 In-house facility or has the knowledge and skills to interpret any subcontracted FA. A list of internally 4 approved external FA facilities is available. Benchmarking Improvement Results Does not have evidence of benchmarking 0 Proactively participates in benchmarking business-wide best practices 2 Fully documented system exists for benchmarking business-wide best practices and has benchmarking 4 records on file, including best practices. Cost of Quality (COQ) Program No COQ system exists. 0 COQ program exists in some areas. Production and field return areas (at least) have a minimum of 6 2 months of records. Plans for improvement (lower failure costs) exist. Fully integrated COQ program exists including design, test, manufacturing and field costs with trend charts, 4 goals and action plans available. Business Disaster Recovery Plan Capacity Planning No planning process exists 0 Infrequent use of Capacity Planning process to forecast capital expenditures, few records exist 2 Capacity Planning process occurs regularly to forecast capital expenditures, records on file 4 Product Safety Program No evidence of viable program. 0 Responds to Customer concerns and has process in place to address issues. 2 4 Proactive program in place which provides for emergency response, delegated responsibilities within organization to address safety issues and an escalation process that informs customers in a timely manner.

Strengths: Opportunities: Other Notes: Strengths: Opportunities: Other Notes:

2.3

2.4

2.5

Environmental Control Program 0 No program exists A limited environmental program exists and is documented and at a minimum there is evidence that the 2 supplier is compliant to local and federal regulations ISO 14001 certified, a documented comprehensive business strategy exists which drives the organization to adhere to all local and federal standards, with evidence that environmental impact audits are conducted and 4 acted upon (examples include Lead Free, Halogen free, recycling, waste elimination, showing plans and time scales) Internal Information Technology Systems Support 0 No full time staff dedicated to systems 2 Information Systems support

is outsourced 4 Full time dedicated IT staff which supports all internal business, quality, and production control systems Motorola Schedule Sharing

Strengths: Opportunities: Other Notes:

Strengths: Opportunities: Other Notes:

Supplier Name:

Supplier A

Place an "x" in the box next to corresponding score for each question

1.0Quality System1.1

Capability Mapping- supplier英文原稿

No reviews with management occur

2

Irregular reviews of quality metrics including field returns with management occur with some coverage of

cycle time and on time deliveries

Regular reviews of quality metrics including field returns with management occur with coverage of metrics

Capability Mapping- supplier英文原稿

4and actions plans for improvement of cycle time, on time delivery, and internal assessments. Trend charts

are available, showing improvement over the last 12 months.

1.2

Capability Mapping- supplier英文原稿

0Has no plans, no accreditation1Working towards approval2Evaluation date confirmed and registrar identified

Approved or meets the requirements of ISO9001/ISO9002/QS9000 and has been accredited for less than 3

3

years, last external audit available with corrective actions. If certification is for ISO9001/9002:1994 standard,a plan is in place to obtain certification for the ISO9001/9002:2000 standard.

Approved or meets the requirements of ISO9001/ISO9002/QS9000 and has been accredited for 3 or more4

years, last external audit available with corrective actions. If certification is for ISO9001/9002:1994 standard,a plan is in place to obtain certification for the ISO9001/9002:2000 standard.

1.3

No internal auditing exists

Capability Mapping- supplier英文原稿

1

Auditing occurs, but there is no formal procedure2

A formal procedure exists and is deployed

Capability Mapping- supplier英文原稿

3

A formal procedure exists, audits are routinely scheduled and deployed, corrective actions taken and results

evident

4

A formal procedure exists, audits are routinely scheduled and deployed, corrective actions taken and results

are achieved and reviewed with senior management

1.4

Capability Mapping- supplier英文原稿

No documentation exists for Responsibility / Authority1

There is an organizational chart outlining Responsibilities, communicated to all employees2

Capability Mapping- supplier英文原稿

There is an organizational chart outlining Responsibilities included in the company quality manual2The responsibilities and authority of all department / functions clearly defined (especially quality function)

4

The responsibilities and authority of all department / functions clearly defined and mapped (i.e. aResponsibilities, Authority, and Informed Matrix; RAI)

Capability Mapping- supplier英文原稿

1.5

No quality system software in use2

Quality system software which records defect traceability and trends, is in use for some areas & data is

available for review within 24 hours

Capability Mapping- supplier英文原稿

4

Quality system software which contains defect traceability and trends, is in use for all areas & is availableon-line real-time. There is evidence that collected data has led to product / process improvements.

1.6

Capability Mapping- supplier英文原稿

No evidence of document control2

Formal, controlled, documentation exists, non-conformances were observed4

Formal, controlled documentation exists with change authority, NO non-conformances were observed

Capability Mapping- supplier英文原稿

1.7

Does not measure2

Measures return rate and has established improvement goals4

Measures return rate, has established improvement goals, and improvement plans with demonstrated

results

1.8

None2

Contracted out. A list of internally approved external FA facilities is available.

Capability Mapping- supplier英文原稿

4

In-house facility or has the knowledge and skills to interpret any subcontracted FA. A list of internally

approved external FA facilities is available.

1.9

Does not have evidence of benchmarking2

Proactively participates in benchmarking business-wide best practices4

Fully documented system exists for benchmarking business-wide best practices and has benchmarking

records on file, including best practices.

1.10

No COQ system exists.2

COQ program exists in some areas. Production and field return areas (at least) have a minimum of 6

months of records. Plans for improvement (lower failure costs) exist.

4

Fully integrated COQ program exists including design, test, manufacturing and field costs with trend charts,

goals and action plans available.

2.02.1

No planning process exists2

Infrequent use of Capacity Planning process to forecast capital expenditures, few records exist4

Capacity Planning process occurs regularly to forecast capital expenditures, records on file2.2

No evidence of viable program.2

Responds to Customer concerns and has process in place to address issues.4

Proactive program in place which provides for emergency response, delegated responsibilities within

organization to address safety issues and an escalation process that informs customers in a timely manner.

2.3

0No program exists

2

A limited environmental program exists and is documented and at a minimum there is evidence that thesupplier is compliant to local and federal regulations

ISO 14001 certified, a documented comprehensive business strategy exists which drives the organization to4

adhere to all local and federal standards, with evidence that environmental impact audits are conducted andacted upon (examples include Lead Free, Halogen free, recycling, waste elimination, showing plans and2.4

time scales)

02No full time staff dedicated to systems4Information Systems support is outsourced

2.5

Full time dedicated IT staff which supports all internal business, quality, and production control systemsStrengths:

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Capability Mapping- supplier英文原稿

Opportunities:Other Notes:

Strengths:Opportunities:

Capability Mapping- supplier英文原稿

Other Notes:

Capability Mapping- supplier英文原稿

Strengths:

Opportunities:Other Notes:

Strengths:Opportunities:Other Notes:

Strengths:Opportunities:Other Notes:

Strengths:

Opportunities:Other Notes:Strengths:

Capability Mapping- supplier英文原稿

Opportunities:Other Notes:

Capability Mapping- supplier英文原稿

Strengths:Opportunities:Other Notes:Strengths:Opportunities:Other Notes:Strengths:Opportunities:Other Notes:

Strengths:Opportunities:Other Notes:Strengths:Opportunities:Other Notes:

Strengths:Opportunities:Other Notes:

Strengths:Opportunities:Other Notes:

第1页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email