Pneumatic Test Method Statement TEMPLATE

This work procedure highlights the work sequence intended for Pneumatic testing of aboveground metallic plant piping systems. Execution of the work

shall be in accordance with relevant project specifications and standards.

NOTE – Due to the hazardous nature of pneumatic testing a separate Method Statement with individual calculations will be submitted for SK/FAL Approval.

2.0

000-50S-0014 Rev. 3 : Specification for Pressure Testing of Piping Systems

700-85S-0005 Rev 9 : Welding, PWHT and NDE of Plant Piping

ASME B31.3: Process Piping (2006)

:

3.1 Pneumatic Test Supervisor

The Pneumatic Test Supervisor shall ensure that all foremen, test personnel and other craftsmen are properly oriented in the proper and safe method of pneumatic testing of metallic piping systems. He shall ensure strict compliance with the requirements of this procedure, Quality Control Manual and related ITPs, Safety Manual and other related work procedures during the execution of the work. He shall coordinate with the QC department regarding the quality requirements prior to start of the work.

3.2 Safety Supervisor

The Safety Supervisor shall ensure that all workers are in compliance with the

requirements of the Safety Manual. He shall check and ensure that the work area is barricaded and isolated from other un-authorized personnel. He is responsible for monitoring the work area for any unsafe conditions and make corrective actions

where necessary. He will directly liaise with the field supervisors regarding the safety aspect of the on-going work.

Pneumatic Test Method Statement TEMPLATE.doc Page 1 of 8