文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 表格/模板 > 调查/报告 > HC12091901 - 8D Report
侵权投诉

HC12091901 - 8D Report

vxcvxcvxcvvxc

Rev: October 30/09

Corrective Action Report (CAR) Supplier

Code:

Date Opened: 19-Sep-12 Next Status Due Date: Date Revised: Close Date:

23-Oct-12

Status: Open Open / Closed Component Part No.: Description: Manufacturing Location:

Customer Rejection # HC12091901 Plant # GM Korea 72143

(1) TEAM CONTACT Contact Danny Xu Phone 13955100603 Activity Team Members Danny Xu Victor Wu Quintus Chen

(2) PROBLEM DESCRIPTION Car Model: GSUV Initiator: Danny Xu Problem Description:

95168460/1 DLK rods HTAC

1. broken issue of FRT LH GSUV door rod at GMK production line while assembling to O/S HDL BRKT 2. request you Actual data of min. 10 samples in your stock

(3) CONTAINMENT ACTIONS ACTION(S): 1.measure current tooling and parts dimension . 2.according to section data ,notice supplier to do tooling tuning-up.

Responsible Person

TARGET DATE

EFFECTIVE DATE

VERIFICATION METHODS force tset result and visual check

RESULTS our parts is OK,but can do improvement

Danny Xu

20-Sep-12

20-Sep-12

Quintuns Chen

(4) ROOT CAUSES PFMEA PRE RPN Severity Occurrence Detection POST

CAUSE(S) FOR OCCURRENCE: tooling cavity dimension has some deviation with 3D drawing.we can not control 2+/-0.25mm tolerance in production line .

CAUSE(S) FOR ESCAPE: we only use check fixture for overall length ,we did not measure parts dimension for every batch.

(5) CORRECTIVE ACTIONS Interim Actions:

Responsible Person

TARGET DATE

EFFECTIVE DATE

(6) VERIFICATION METHODS RESULTS

Permanent Actions: do tooling tuning-up,change cavity position 0.5mm,then the rod insert dimension will change 0.5mm quintuns Chen Tier 2 supplier Rilong 30-Oct-12 customer use projector to confirm the section data with 3d drawing Do 100pcs improved sample vechicle test in GMK

(7) PREVENTION Preventative Measures:

Lessons Learned Updated (Y/N):

Responsible Person

TARGET DATE

EFFECTIVE DATE

(6) VERIFICATION METHODS Attach certification label for improved parts Then GMK will feedback us vvechicle test result

RESULTS

ask supplier to do dimension check for every batch parts,and do force test for every batch parts.

quintuns Chen Danny Xu

7-Nov-12

(8) TEAM MEMBER / REVIEW & APPROVALS Team Champion: Review & Approval Date: 203380131.xls, Hinge

Danny Xu 12.10.23

Quality Manager: Review and Approval Date:

Plant Manager: Review and Approval Date:

Rev: October 30/09

HC12091901 - 8D Report

203380131.xls, Hinge

第1页

你可能喜欢

热门文档

相关文档

  • 8D-REPORT

    8D-REPORT FAX: TO: CC: 品名 P/N: 供方/客户 Custoner Discipline 1 不良描述 情报入手日 Date opened 退货数量Quantity FM: 编号S/N: 制作日 Last ...

  • 8D report

    8D report_工程科技_专业资料。Report No. 0509xx Report Date :05/09/26 Page:1/1 8-DISCIPLINE REPORT Customer (客户名称) : Customer RefReport No. ...

  • 8D CAR Report Skill-初级班

    8D CAR Report Skill-初级班_调查/报告_表格/模板_应用文书。 8D CAR Report Skill PSMC Quality Assurance Department Henry Hu 19th Mar. 2007 学习目标在...

  • 8D Report - Cesco 模版

    8D Report - Cesco 模版_信息与通信_工程科技_专业资料 暂无评价0人阅读0次下载举报文档 8D Report - Cesco 模版_信息与通信_工程科技_专业资料。8D改善...

  • 8D Report 教育资料

    8D Report 教育资料_教育学_高等教育_教育专区。8D Report CW Yang A. Director ME Parts Quality Mgt. OCT, 24, 2011 1 Supplier Quality Management Op...

  • BTE-12015O-OI-N-A-A0 8D Report(2013-10-8)

    BTE-12015O-OI-N-A-A0 8D Report(2013-10-8)_调查/报告_表格/模板_应用文书。8D 报告模板 中英双语??? ?? ? ? ? ? ?? 库库库检 检 ? ?? ?...

  • QMS2-0006FM01 8D Failure Analysis Report (01)_免费...

    Customer Complaint No 8D report No Issue Date 8D Failure Analysis Report Discipline 1 Role 角色 Chairman 主导 Leader 责任主管 Members 团队成员 Use Team ...

  • 8D report of 61626-1 (2) (1)

    8D report of 61626-1 (2) (1)_机械/仪表_工程科技_专业资料。4725-11(3/10) 8-D Corrective Action Worksheet - Inter-Plant Response Owner: Ju, ...

  • One 8D Report Example

    One 8D Report Example_电子/电路_工程科技_专业资料。8D Report Example8D CORRECTIVE ACTION REPORT Page 1 DISCIPLINE 1 INTERNAL MEMBERS Xxx,xxx,xxx,xxx,...

  • 8D report self-assessment

    8D Report self-assessment Innovate to display the difference 哪些问题会用8D? 哪些问题会用 Design quality issue Manufacture process quality issue Material ...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email