文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 交通运输 > 北京地铁十号线综合监控系统的工程创新概论
侵权投诉

北京地铁十号线综合监控系统的工程创新概论

This article describe Beijing Metro Line 10 phase1 and phase2 project ISCS (Integrated Supervisory and Control System) engineer innovation, analyze BJL10P2 key technical issue and software solution in large scale loop metro line ISCS stage construction, proceed the engineering practice in the Mass Transit ISCS software platform and function development direction.

北京地铁十号线综合监控系统的工程创新概论

丁军

【内容摘要】

本文阐述了北京地铁十号线一、二期工程的综合监控系统的工程创新,分析了北京地铁十号线规模环线地铁综合监控系统分期建设过程的关键技术问题及软件解决方案,在轨道交通综合监控系统软件平台与功能开发领域的技术发展方向进行了有意义的工程实践。

This article describe Beijing Metro Line 10 phase1 and phase2 project ISCS (Integrated Supervisory and Control System) engineer innovation, analyze BJL10P2 key technical issue and software solution in large scale loop metro line ISCS stage construction, proceed the engineering practice in the Mass Transit ISCS software platform and function development direction.

随着中国经济蓬勃迅猛发展,在城市轨道交通新线建设速度日益增快、城市轨道交通网规模不断扩大的同时,城市轨道交通不断对成功运营的城市轨道交通既有地铁线路提出了诸如延长运营里程、有效增加载客量、显著缩短发车间隔的提高质量、提高运力的更高运营目标要求。随着北京地铁十号线环网一、二期工程建设的加速,北京地铁十号线一期奥运工程已经在2008年奥运会前成功投入商业运营,组成了整个十号线环网的一半,二期工程计划于2013年5月竣工,构成了环网的另一半,最终要实现整个十号线的全线环网贯通运营目标。地铁运营需要通过地铁控制中心(OCC)的综合监控系统监控平台(ISCS)完成北京地铁十号线一、二期期环线地铁的7×24不间断监视、控制与运营调度,进而对综合监控系统软件平台提出了更高的技术要求。

本文将重点阐述北京地铁十号线一、二期期工程的综合监控系统工程创新,分析在大规模环线地铁综合监控系统分期建设过程的关键技术问题及软件解决方案。

一、 十号线一、二期工程概况

北京地铁十号线车站多、运营线路长、环形贯通运营奠定了本工程的基调。北京地铁十号线一期(含奥运支线)ISCS工程包括22个车站、万柳车辆段、控制中心(原奥运支线4个车站需要剥离出归属十号线一期并划归到八号线运营),一期工程已经在2008年奥运前投入商业运营; 十号线二期24个车站、1座停车场、1座控制中心、1座备用中心,一、二期将构成方形环形地铁轨道并最终按照环形方式投入运营,这在世界地铁建设史开创了绝无仅有的先例。

第1页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email