文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 外语学习 > 英语学习 > JPT2006_07_MER_focus
侵权投诉

JPT2006_07_MER_focus

MULTILATERAL/EXTENDED REACH

OVERVIEW Cost-effective access to remote offshore reserves from fixed platforms or to offshore reserves that exist close to onshore locations often requires the use of extended-reach drilling (ERD) and multilateral technology. The ability to apply this technology routinely in future oil provinces, such as those in remote Arctic locations, will be vital to ensure economic success. A recent class of wells, termed ultra-ERD, has highlighted technical challenges that require both the nurturing and advancement of technology. Note that an ultra-ERD well can be loosely defined as one that has significantly higher stepout than other wells in the same reservoir horizon. The feasibility of drilling and completing such wells is primarily determined by stepout, vertical depth, and degree of difficulty imposed by the subsurface environment. Currently, the industry is looking to drill its first 12-km-stepout ultra-ERD well. Current technology development is targeted at increasing reliability of downhole tools, evolving novel methods of reducing equivalent circulating density, and honing techniques that deliver effective and quantifiable torque and drag reduction. One key obstacle is that of reliably proving up prototype technology before its application in the field. In many cases, through necessity, only laboratory tests or limited field trials have been carried out. Designs for ultra-ERD wells also pose an interesting challenge. One key to success is to identify the most critical operations correctly and build the well design around those operations. In this context, one particular mindset that must be overcome is that of being constrained by standard casing sizes; instead, design the well to be fit for its intended purpose. However, this requirement must be tested against the challenge of long lead times for nonstandard steel products and the likely constraint of having to work with a nonoptimal rig. While incremental improvements in drilling hardware are undoubtedly occurring, there are clear opportunities for performance gains through real-time analysis, monitoring, diagnostics, and visualization of drilling and casing/completionrunning operations. This initiative will require a joint effort by both operators JPT and service providers to identify and meet industry needs. Colin Mason, SPE, is a senior drilling engineering specialist with BP’s E&P Technology Group. He has spent more than a decade working on the many facets of ERD operations. Previously, Mason was involved in the application of mathematics to solve engineering problems in the fields of gas transmission and pipeline design. He holds MS and PhD degrees in numerical analysis from Imperial College, London. Mason serves on the SPE Annual Technical Conference and Exhibition Drilling Design and Operations editorial committee and is an SPE Distinguished Lecturer for 2006–07. He also serves on the JPT Editorial Committee. Multilateral/ Extended Reach additional readin

g available at the SPE eLibrary: doc.guandang.net SPE 98471“Introduction of New Drilling Technology Improves Performance of Mature North Sea Assets” by J. Anderson, Talisman U.K. Ltd., et al. SPE 95652“Two-Phase Correlation for Multilateral-Well Deliverability” by R. Kamkom, Texas A&M U., et al. SPE 97520“Redevelopment of Matured Multilayered Carbonate Offshore Field Through High-Technology Horizontal and Multilateral Wells” by R. Kumar, SPE, Oil& Natural Gas Corp. Ltd., et al.

64

JPT JULY 2006

JPT2006_07_MER_focus

第1页

你可能喜欢

热门文档

相关文档

  • 解决focus magic在potoshop使用中的9142问题

    解决focus magic在potoshop使用中的9142问题_电脑基础知识_IT/计算机_专业资料。focus magic的9142问题解决方法。解决focus magic 在 potoshop 使用中的 9142 问题:...

  • 06_Environmental_Science_Special_Focus

    AP? Environmental Science 2006–2007 Professional Development Workshop Materials Special Focus: Energy and Climate Change connect to college success? www.college...

  • linuxer1-2006-07

    网上有点难找,linuxer1-2006-07至linuxer12-2007-06,共12本网上有点难找...(原文为 challenged by delays in introducing new technology, a focus on ...

  • sympatex playbook 06-07

    Focus on retail ? Focusing on on-line promotion and events ? Evidence ...SYMPATEX? China Marketing Stage 06-07 Aug.2006 - Aug. 2007 - …… ...

  • 电脑爱好者普及版2006-07

    电脑爱好者普及版2006-07_IT/计算机_专业资料。电脑爱好者普及版...CFanPE [ CFan新视线 ] News & Focus 新闻 5 6 7 8 9 特别关注 数字时代...

  • ECON5002_Macroeconomic Theory_2010 Semester Summer_...

    A brief look at global conditions with a focus on Australia’s recent ...From an economic point of view, the period 1996-2006 was one of the ...

  • (11).键盘输入、鼠标输入、焦点处理

    AndFocus.Window1" 2: xmlns="http://schemas.microsoft.com/winfx/2006/xaml/prese ntation" 3: xmlns:x="http://schemas.microsoft.com/winfx/2006/xaml" ...

  • 可视化程序设计(2006-2007

    可视化程序设计(2006-2007可视化程序设计(2006-2007隐藏>> 授课主要内容或板书...4.常用事件:Change、LostFocus、KeyPress 2.2.5 列表框(ListBox) 1.作用:...

  • 陈泓宇价G周报告2013-06-07

    陈泓宇价G周报告2013-06-07_企业管理_经管营销_专业资料。陈泓宇价G周报告... remove focus from the Filter entryfield #2748, Pasimete indenai ant ...

  • 1504-04-Focus

    JPT2006_04_HO_focus 10页 5财富值 积极心理学04-Focus 49页 免费 哈佛公开课《幸福课》04-F... 58页 免费 福克斯维修手册第三章动力... 9页 免费 ...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email