Cable Eraction Test at Splay Band f

桥梁

Cable Eraction Test at Splay Band for Spatial Suspension Bridge

Heungbae Gil , MASCE, AND Youngjae Choi

Abstract:

The Youngjong Grand Bridge include a self-anchored suspension bridge with inclined cable planes.The bridge use splay band (cable collars) to flare the main cable at anchorage, which is located at the end of a stiffing truss. During the cable erection,some of the wires at the splay band were expected to experience lateral displacement and/or lift phenomena because of the large flare angles at the splay band .mockup cable erection test at the anchorage were carried out to find the degree of displacement of wires and to determine appropriate measures to deal with these problems ,through these problems . Through these tests ,method to arrange wires at the splay bands were devised and tried ,and select method was successfully used for actually bridge. DOI:10,1061/(ASCE)1084-0702(2002)7:5(300)

CE Database keywords: Bridges, suspension ; Korea; Cables

Introduction

The young jiong Grand bridge consists of a steel box girder span, a truss span ,and a suspension span(Gil and cho1998).The suspension span (550m) is a self-anchored suspension bridge with inclined main planes(Fig.1).Self-anchored suspension bridge have the main cable anchorage at the Stiffing truss ,and only a limited number of them have been built (ochsendorf and biillington 1999).Due to the spatial layout of the cable ,the main cable plane of the main span is vertical during the cable spinning .But the cable planes become inclined as the hanger ropes (suspender )are linked to the main cable .In the completed state, the cable planes of the main and side spans are inclined ,The main cable planes of the suspension have 14 strands ,each of which Is composed of 480 galvanized parallel wires with a diameter of 5.1mm .the air spinning method ,which can have more wires per strands than the parallel wire strand method ,is used to erect main cables.

The typical suspension bridge use splay saddles to splay the main cable near the anchorage .The strands diverging from the splay saddles are flared and anchored to strand shoes or sockets and transmit the cable forces to anchor block ,In general ,the splay saddle is placed above the strand shoes or socket and spreads the cable downward .To flare the main cable as shown in Fig2 ,the suspension span of the Grand Bridge has a splay band (cable collar )rather than a splay saddle .The splay band binds and then spreads the cable symmetrically in the vertical and horizontal plane .The splay band shown in Fig3 is installed with an angle of 16.314°,which correspond to the angle of the main cable centerline .To accommodate the flare ,vertical and horizontal spacers ,shown in Fig4 ,are placed between the strands at the exit side of the splay band ,the splay band composed of two parts ,the top and the bottom .during the cable spinning ,the bottom of the splay band is temporarily fixed to the stiffing truss and wires are erected on it.the bottom has rectangle grooves to house the strands. after completion of the cable erection ,the top and bottom of the splay band are fastened by bolts and then the bands are released from the stiffing truss and equilibrium in the air.

The unique features of the suspension span –the self-anchored and spatial cable layout –pose cable erection problems ,which are most prominent in the tower saddles and at the splay band .Mockup erection test were performed to deal with these problems ;The problems of and the results of the mockup tests at the tower saddle are dealt with in an other paper (gil and choi2002) .this paper presents the results of mockup tests at the splay band .A few alternative proposals were

第1页

你可能喜欢

热门文档

相关文档

  • CABLE

    Round Cable Assembly 基础教育(一) 线装研发部制作 2001年8月6日 Round Cable Assembly 基础教育认识电线电缆 电线电缆在整个工业发展过程中,扮演著重要的角色,...

  • CABLE_训练教材

    Mobile Phone Cable 6. Audio/Video Cable 7. Custom OEM & ODM Cable 第二章 常用物料基础知识 第一节 电线 一.简述 电线可以理解为是信号传输的桥梁或载体...

  • CABLE 术语一览表

    CABLE 术语一览表一、 COLOR TYPE<颜色类> Black<黑色> Brown<棕色> Yellow<黄色> Green<绿色> White<白色> Gray/Grey<灰色> Red<红色> Orange<橙色> Blue<...

  • cable

    cable_信息与通信_工程科技_专业资料。电脑周边Cable产品介绍 电脑周边Cable产品介绍 Cable Prepared By:Harry Han 目录 一.电脑周边Cable产品分类 二.电脑周边Cable...

  • cable知识讲解

    CABLE 的定义、分类及主要性能 1. CABLE 的定义 1.1 CABLE 广义:CABLE 即电线电缆,是用以传输电(磁)能、信息、和实现电磁能转换的线材产品。 1.2 CABLE ...

  • CABLE 知识for customer

    CABLE 知识for customer_计算机软件及应用_IT/计算机_专业资料。Cable的介绍华力电子有限公司 2007/11/26 1 2 CABLE 知识简介备注: 仅仅以NOTEBOOK 涉及介绍制作...

  • cable 基础知识介绍

    抗张好质量轻 SerComm Confidential Slide 6 Cable零件讲解—导体 AWG简介 AWG (American Wire Gauge)是美制电线标准的简称,AWG值是导线外径 D(以英寸计)的函数。...

  • CABLE 基础知识

    CABLE 基础知识_英语学习_外语学习_教育专区。主要介绍Cable制作的工艺流程振维电子教育训练教材 ( cable ) 编辑 : 刘涵荣 Rev : A 电线电缆原材料 ? 一. ...

  • CABLE中英文对照表

    CABLE 专业词汇中英对照表连接器 端子 铁粉芯 六角螺丝 金属螺丝 六角螺母 手扭螺丝 垫片(华司片) 开关 转接头 扫所头 电阻(电阻器) 插针&钩键 防尘盖 ...

  • cable行业

    cable行业_专业资料。绝缘线芯挤包工序绝缘线芯的质量将直接影响到电缆的电气性能。为了提高电缆的质量,我们选择高电性能绝缘材料生产,例如1.8/3kv变频电机专用...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email