转运中心车辆与货柜配置之规划
pp. 529-538.
7. Sheffi, Y. and C. Barnhart , 1993,”A
network-based primal dual heuristic for the solution os multi-commodity network flow 102-117. 8. Leung , J. M.Y. , T. L. Magnanti , and V.
Singhal , 1990,”Routing in point-to point delivery system: formulation and solution pp.245-260. 9. Powell , Warren B. and Yosef
Sheffi,1989,”Design and implementation of an interactive optimization system for network design in the motor carrier pp.12-29. 10. Eckstein, Jonathan and Y. Sheffi ,
1987,”Optimization of group line-haul ope- rations for motor carriers using twin
effect the empty traveling percentage.
However the higher transportation loads result in lower demend in both vehicles and cargo carriers.
Keywords¡GTransportation Hub,Planning ,
Cargo Vehicle
The Planning of Cargo Vehicle in a Transportation Hub
Abstract
The major task of planning a transportation hub is to calculate the appropriate number of transportation vehicles and cargo carriers. A vehicle required planning model is first
created, the objective is to minimize the total vehicles. Assuming the total transportation load in the network, the number of
transportation hubs, the distance between transportation hubs, and the operation time in a hub are given. The constraints in this model include all operations must be
completed within a given time. The model will resolve the appropriate number of
transportation vehicle and cargo carriers for each specified transportation hub.
In order to test and to generalize this model, this research will use simulation to test a series of different pattern of transportation hub network by changing the number of transportation hub in the network, the
distribution of demand and the distance among the hubs, and total transportation loads. The performance measures in this test will include the demand rate of transportation vehicle and cargo carrier, and empty traveling percentage. Simulation experiment showed that the longer of the distance among the hubs , the lower rate of the demand rate of cargo carrier will happen. The transportation loads do not
转运中心车辆与货柜配置之... 8页 免费喜欢此文档的还喜欢 浇注系统 30页 免费...以系统模拟规划转运中心之分类机人员及流道配置以系统模拟规划转运中心之分类机人...
程序运行效率和解的满意性都使证 * 主要应用动态规划方法、 得到很大提高 * 关键词: 转运中心; 车辆运输问题 (+,-) 动态规划算法; ; 混合算法 中图分类号: ...
运输 过程 中的车辆组 合以及 相 关运输安排与 库存问题可用图2 1一 简示,...转运中心车辆与货柜配置... 8页 免费 转运中心车辆数之规划 7页 免费喜欢...
对于一个科学的中转系统规划,如何配置转运车的数量是一个需要认真考虑的问题。...在中转站将小吨位车辆倒换为大型集装箱运输车,并提高垃圾的装载密度,从而提高...
机械将集装箱卸到指定箱 位存放或直接装上站内集卡转运至指定存箱位卸 车存放...各功能块 、 装卸方式选 [6] 择等方面对中心站的规划与建设进行了系统的分 ...
物流中心规划_交通运输_工程科技_专业资料。第九章 ...进行商品周转、分拣业务的物流中心。 转运中心:不...门宽约2.75m,此尺寸可允许将货柜尾端开入月台。 ...
机械将集装箱卸到指定箱 位存放或直接装上站内集卡转运至指定存箱位卸 车存放...各功能块 、装卸方式选 [ 6] 择等方面对中心站的规划与建设进行了系统的分 ...
为使我国城市垃圾转运站(以下简称转运站)的规划、...第4.1.5条 集装箱应与垃圾运输车的载重量及车箱...第4.1.12条 运输车辆的配置数量可采用下列公式计算...
I 型动线流程最常应用于货运站(转运中心)及通过 型的物流中心。大区域规划包括...2 吨车为 11M,4 吨车为 13M,11 吨车为 20M 及拖车、货柜车为 33M。...
集装箱航线规划_专业资料。2.4 集装箱班轮航线规划...能及时转运,相比之下,大连港的干线运输在运价方面不...集装箱航线资产配置鲁棒... 47页 免费 漳州某公司...
热门文档