Section 23 82 16-AIR COILS
SECTION 23 82 16
AIR COILS
SPEC WRITER NOTE: Delete between //---//
if not applicable to project. Also delete
any other item or paragraph not applicable
in the section and renumber the
paragraphs.
PART 1 - GENERAL
1.1 DESCRIPTION
Heating and cooling coils for air handling unit and duct applications
1.2 RELATED WORK
A. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM
GENERATION.
B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.
C. Section 23 31 00, HVAC DUCTS AND CASINGS
D. Section 23 36 00, AIR TERMINAL UNITS: Reheat coils for VAV/CV terminals. E. Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS.
F. Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS G. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS
H. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS: Requirements for
commissioning, systems readiness checklists, and training.
I. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS
1.3 QUALITY ASSURANCE
A. Refer to paragraph, QUALITY ASSURANCE, Section 23 05 11, COMMON WORK
RESULTS FOR HVAC, //Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION//.
B. Unless specifically exempted by these specifications, heating and
cooling coils shall be tested, rated, and certified in accordance with AHRI Standard 4l0 and shall bear the AHRI certification label.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA,
and SAMPLES.
B. Manufacturer's Literature and Data for Heating and Cooling Coils: Submit
type, size, arrangements and performance details. Present application ratings in the form of tables, charts or curves.
C. Provide installation, operating and maintenance instructions.
D. Certification Compliance: Evidence of listing in current ARI Directory
of Certified Applied Air Conditioning Products.
E. Coils may be submitted with Section 23 73 00, INDOOR CENTRAL-STATION
AIR-HANDLING UNITS, Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS, Section 23 36 00, AIR TERMINAL UNITS, or Section 23 82 00, CONVECTION HEATING AND COOLING UNITS.
JTG D82-2009公路交通标志和标线设置规范23_交通运输_工程科技_专业资料。JTG-D82-2009公路交通标志和标线设置规范今日推荐 81份文档 笑话大全集 笑话大全爆笑...
Air Flow Control Valves and Terminal Units: Section 23 36 00, AIR TERMINAL UNITS. H. Duct Mounted Coils: Section 23 82 16, AIR COILS. I. Return ...
F. Section 23 22 13, STEAM AND CONDENSATE HEATING PIPING: Requirements for field steam and condensate piping. G. Section 23 82 16, AIR COILS: ...
Choke Coils ■ Examples Type 09D Inductance (?H) 2.2 2.7 3.3 3.9 4.7 5.6 6.8 8.2 10.0 12.0 15.0 18.0 22.0 27.0 33.0 39.0 ...
23b46ef5-9fbf-4b82-95d0-9ab5e70b4cf2_IT/计算机_专业资料 暂无评价
Choke Coils 暂无评价 7页 免费 Choke_简介 14页 1财富值 Choke 2页 免费 R CHOKE 1页 免费 choke电感 62页 2财富值 power choke 18页 免费 EE8.3 ...
2011 ASHRAE Handbook--12-16 Air craft_环境科学/食品科学_工程科技_专业资料 暂无评价
ZYH44厚浆环氧煤沥青防锈漆— ZY-F-23 中远 H44-82 厚浆环氧煤沥青防锈漆—红棕色※产品概述 ·两罐装环氧焦油漆,综合了环氧树脂的坚韧、耐磨、耐化学品性和...
发展经济学 姚洋 f.82.199-2007-3-26-23-33-12_经济/市场_经管营销_专业资料。第五章、二元经济结构一、 剩余劳动力的概念 1. 剩余劳动力的定义 按照...
F250-23-3.82/450/150循环流化床垃圾焚烧锅炉的设计 隐藏>> 维普资讯 http://www.cqvip.com ? l 6? 江 西能 源20()071 研究探讨 F5.338/5/5202....
热门文档