文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 能源/化工 > An analysis of inaccuracy in piepline construction cost estimation
侵权投诉

An analysis of inaccuracy in piepline construction cost estimation

Int. J. Oil, Gas and Coal Technology, Vol. 5, No. 1, 2012

29

An analysis of inaccuracy in pipeline construction cost estimation

Zhenhua Rui*, Paul A. Metz and Gang Chen

Department of Mining and Geological Engineering, University of Alaska Fairbanks,

Duckering Building 418, P.O. Box 750708, Fairbanks, Alaska, 99775, USA Fax: +1-907-474-6635

E-mail: zhenhuarui@gmail.com E-mail: pametz@alaska.edu E-mail: gchen@alaska.edu *Corresponding author

Abstract: The aim of this paper is to investigate cost overrun of pipeline projects. A total of 412 pipeline projects between 1992 and 2008 have been collected, including material cost, labour cost, miscellaneous cost, right of way (ROW) cost, total cost, pipeline diameter, pipeline length, pipeline’s location, and year of completion. Statistical methods are used to identify the distribution of the cost overrun and the causes for overruns. The overall average cost overrun rates of pipeline material, labour, miscellaneous, ROW and total costs are 4.9%, 22.4%, –0.9%, 9.1% and 6.5% respectively. The cost estimation of pipeline cost components are biased except for total cost. In addition, the cost error of underestimated pipeline construction components is generally larger than that of overestimated pipeline construction components except total cost. Results of analysis show that pipeline size, capacity, diameter, length, location, and year of completion have different impacts on cost overrun of construction cost components. [Received: May 26, 2011; Accepted: June 28, 2011] Keywords: pipeline cost; cost overrun; cost estimation.

Reference to this paper should be made as follows: Rui, Z., Metz, P.A. and Chen, G. (2012) ‘An analysis of inaccuracy in pipeline construction cost estimation’, Int. J. Oil, Gas and Coal Technology, Vol. 5, No. 1, pp.29–46. Biographical notes: Zhenhua Rui is a PhD candidate in Energy Engineering Management and MBA student at the University of Alaska Fairbanks. He also received his Master’s degree in Petroleum Engineering from the same university, in addition to his Master’s degree in Geophysics from China University of Petroleum, Beijing. His current research is the Engineering Economics of the Alaska In-state Natural Gas Pipeline.

Paul A. Metz is a Professor of Department of Mining and Geological Engineering at the University of Alaska Fairbanks. He received his PhD from Imperial College of Science Technology and Medicine. He also received his MS in Economic Geology and MBA from the University of Alaska. His research interest include: market and transportation analysis of mineral resources; analysis of transport systems; engineering geological mapping and site investigation; mineral and energy resource evaluation.

Copyright © 2012 Inderscience Enterprises Ltd.

第1页

TOP相关主题

你可能喜欢

热门文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email