文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > V. Agent-Based Framework for Simulation and Support of Dynamic Engineering
侵权投诉

V. Agent-Based Framework for Simulation and Support of Dynamic Engineering

Abstract. The paper reports on the first results of the Productivity Simulation Initiative (PSI) project of Cadence Design Systems GmbH. The project addresses the problem of fine-grained modeling and simulation of dynamic engineering design processes in or

One of these problems is the modeling, the assessment and the prediction of the productivity of the teams performing design in order to be capable to optimize and manage a time-cost trade-off “on the fly” preserving the high quality of the expected final design product.

The task of building a software system able to reliably assess, predict and optimize the productivity in a Dynamic Engineering Design Process (DEDP) is at least threefold. The first aspect is that the system needs the adequate representation model of the world – i.e., the environment comprising the processes and the collaborative teams of autonomous actors who play these processes. The second aspect is that the system needs the adequate model of a DEDP. And the third aspect is that the system needs well defined and reliable productivity metrics and their assessment and prediction mechanisms. It is also important to notice that the mentioned representation models, metrics and mechanisms should be well grained and balanced to constitute adequate, feasible, and reliable framework.

The goal of the 1-st phase of the PSI project is to develop and to validate an agent-based simulation framework designated for future use in assessment and prediction of the design process productivity thus forming the prerequisites for the design process optimization and on-line management. Particular subtasks of this phase are: to develop the formal framework for modeling the world and the processes, to implement the demonstrator of this framework in the form of multi-agent simulator prototype (further on referred to as DEDP-MAS), and to use it for experimenting with several application scenarios for assessing the feasibility and the further development of the approach.

The paper is structured accordingly. Section 2 presents our problem statement and the rationale for the focus of our activities. Section 3 sketches the approach, modeling and implementation methodology used. Section 4 describes the two of our application scenarios and the experimental settings. Section 5 reports on the simulation experiments of different types. The reminder of the paper discusses the related work provides conclusions and our plans for future work.

2 Problems Addressed and Benefits Gained

PSI project bases itself on the understanding that engineering design processes in the vast majority of cases and industrial branches are weakly defined and heavily influenced by unpredictable dynamic changes. Therefore, these processes should be performed in quite a flexible manner to ensure meeting the objectives and to demonstrate at least near-optimal productivity and quality of results. Gaining such flexibility seriously depends on the capability to assess the feasibility of the initial plan, to react to the changes in the process in timely and flexible manner through re-planning, to evaluate the plan in terms of the predicted productivity and the result quality. Hence, one of the tasks of PSI was to implement a software tool capable to play DEDP simulation games for both:

– Evaluating the initial plan for an engineering design project using predictive simulation, and

上一页第2页

你可能喜欢

热门文档

相关文档

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email