ITP NEC Standard

Solar Turbines

A Caterpillar Company

Inspection and Test Plan

Certification:

NEC

T70 GS NEC PD # WT70GS1

Revision Number:0

Prepared for

Dated:August 19, 2004

customer name

This ITP was Prepared By: Package QE

Equipment includes 1 Each, Taurus GS Package(s). Powered by turbine(s).

____ Working Days Notification Required For All Customer INSPECTION/OBSERVATION Items.

This generic ITP is provided as an example only. An ITP based on the scope of the Solar

Proposal must be requested from the Product Quality Engineer.

Inspection Points:Column A is

Solar Inspector / Engineer

Column B is

Column C is

Column D is

The ITP is developed from the Solar Application Check Sheet (ACS) and information provided by the Business Manager and the Project Applications Engineer. Revisions are based on Customer input provided during project execution.

Special inspections, documents or tests above and beyond our standard are shown.

The legend at the bottom of each page indicates what inspection / test points or documents are required.'O1'Indicates Customer, Third Party or Certifying Agency inspection on 100% of units, operations or tests on that project. Every

effort is made to have the inspector present when these operations are conducted. The inspection or test has not

necessarily been performed in advance, prior to the observation point. Should the inspector be unavailable at the time of the actual inspection or test, production is not stopped. Review of verifying documents is included. Equipment in ITP Section 1.0 shall be released if Customer's Inspector fails to respond or fails to appear.

'O2'Identical to 'O1', but performed on a sampling of units, operations or tests on that project (not necessarily 100%). Every effort

is made to have the inspector present when these operations are conducted. The inspection or test has not necessarily been performed in advance, prior to the observation point. Should the inspector be unavailable at the time of the actual inspection or test, production is not stopped. Notification requirements are the same as for '01'. Equipment in ITP Section 1.0 shall be released if Customer's Inspector fails to respond or fails to appear.

'A1'Indicates Solar inspection or test on 100% of units, operations or tests on that project.

'A2'Indicates Solar inspection or test on only a sampling of units, operations or tests on that project.

'R1'Indicates an in-process document review is required on 100% of units on that project. The in-process review is to take place

at the operation or test location unless the document is included in the databook. A copy of the verifying document is not supplied unless also identified with an 'X' in Solar's column 'A'.

Indicates an in-process document review is required on only a sample of units on that project. The in-process review is to take place at the operation or test location unless the document is included in the databook. A copy of the verifying document is not supplied unless also identified with an 'X' in Solar's column 'A'.project specific.

'R2'

'M2'Indicates a sample monitoring of Solar's system is required. This monitoring will be on random equipment, and may not be 'X'

In Solar's column 'A' indicates a copy of the document will be supplied in the Project Quality Assurance Data Book. The

Databook contains a reference copy of the ITP. Individual documents are identified with the ITP Item number and are found in the corresponding sections. The documents consist of supplier information and Solar information.

All documents are to be submitted to: or Emailed to: solar_quality_documents@solarturbines.comQuality Document Coordinator

Solar Turbines Incorporated (KM20)

PAGE14200 Ruffin Rd.

San Diego CA 92123-1836, USA

第1页

你可能喜欢

热门文档

相关文档

  • NEC appearance standard

    NEC appearance standard_信息与通信_工程科技_专业资料。NEC的外观质量标准Confidential ?? ?? ?? ?~ Do not copy ???”??? No. ?O?Q??O?R?O?Q ...

  • rose+ha与nec+standard+edtion比较表

    rose+ha与nec+standard+edtion比较表_互联网_IT/计算机_专业资料。Rose HA 构建平台、语言、 l i c e n s e 及管理方式可扩展性集群拓扑可用性故障复归时...

  • ITP-201 Salt Spray Test Standard(20080403)

    ITP-201 Salt Spray Test Standard(20080403)_机械/仪表_工程科技_专业资料。... ITP NEC Standard 暂无评价 16页 免费 ASTM B117 Salt spray t... 29页 ...

  • standard ITP List of civil works

    standard ITP List of civil works_建筑/土木_工程科技_专业资料。Annexure (... civil ITP Rev.0 暂无评价 3页 2下载券 ITP NEC Standard 暂无评价 16页 ...

  • NEC服务器

    Standard Maximum Disk Controller FDD (External USB) Optical Disk Drive Display Video RAM Graphic Display HDD *2 NEC Express5800/R320a-E4 N8800-143F ...

  • NEC规格书

    STANDARD NEC TOKIN recommends use of the device with standard quality grade in general electronic equipment like data processing and office equipment, ...

  • NEC工具使用简介

    NEC工具使用简介_信息与通信_工程科技_专业资料。NEC软件教程NECEL技术讲座 - ...Standard I/O 窗口 58 78K0/KX2的Standard I/O 有smplus0x.lib的库支持 ...

  • NEC电机方案

    致尊敬的顾客 关于产品目录等资料中的旧公司名称 NEC电子公司与株式会社瑞萨科技...following three quality grades: “Standard”, “High Quality”, and “...

  • NEC E6000笔记本图纸资料

    NEC E6000笔记本图纸资料_IT/计算机_专业资料。NEC E6000笔记本图纸资料...ITP_CLK0 ITP_CLK1 PREQ# PRDY# DBR# LINT0 LINT1 STPCLK# SLP# DPSLP#...

  • 10-272中英文版ITP

    2013.4.10 Itp No.检验计划编号: ITP Rev No.版本号: REV.0 Equipment ...standard Control of visual dimensions 外观尺寸的控制 Control of visual ...

站点地图 | 文档上传 | 侵权投诉 | 手机版
本站所有资源均来自互联网,本站只负责收集和整理,均不承担任何法律责任,如有侵权等其它行为请联系我们.
文档下载 Copyright 2013 doc.guandang.net All Rights Reserved.  -  email