文档下载 文档下载导航
设为首页 | 加入收藏
搜索 请输入内容:  
 导航当前位置: 文档下载 > 所有分类 > 工程科技 > 电力/水利 > 宋各庄水库大坝变形观测与资料分析
侵权投诉

宋各庄水库大坝变形观测与资料分析

给做大坝分析的朋友们一点参考

宋各庄水库大坝变形观测与资料分析

宋各庄水库大坝变形观测与资料分析

宋各庄水库大坝变形观测与资料分析

宋各庄水库大坝变形观测与资料分析(刘学慧)

doc.guandang.net

放大

时间: 2012-02-10 09:00:17 来源:水科学与工程技术 打印 缩小

摘要:受各种因素影响,土石坝建成后均会产生变形。当变形过大,超过了允许值,就会对坝体安全造成影响。对宋各庄水库建库以来坝体变形观测资料进行整理分析,对坝体变形是否趋于稳定做出结论,并通过倾度计算,分析坝体内部产生裂缝的可能性。

关键词:大坝;变形;倾度;稳定

中图分类号:TV697.2 文献标识码:A 文章编号:1672-9900(2011)04-0067-03 Deformation Observation and Analysis of Song Gezhuang Reservoir Dam

LIU Xue-hui

Abstract:Affected by various factors,the earth-rockfill dam will produce distortion after it has been completed. When the deformation is too large,more than the allowable value,it will affect the safety of the dam. Analysing observation data of supporting for the dam at the Songgezhuang Reservoir,making a conclusion to the dam deformation of the stability,and using the calculation of the tilt,analyzing the possibility of the dam body fissure .

Key words:dam;distortion;tilt;stable

1 概述

1.1 工程概况

宋各庄水库自1975年10月动工兴建,历时11a经过多次组织施工到1986年底竣工,基本达到了“1986年补充设计”确定的工程规模。1990年10月,由河北省水利厅组织宋各庄水库验收委员会,对水库工程进行了验收,并交付使用。1984年6月完成了大坝观测设备安装工程。

由于坝体的工程质量很差,1983年河北农业大学对该坝做的抽样检查试验显示坝体填筑极不均匀,所取土样最大干容重为1.82g/cm3,最小值仅为1.41 g/cm3。所以大坝在施工和运用过程中曾先后发生了3次不同部位和不同程度的裂缝。

(1)1979年7月27日,发现大坝裂缝4条,当时库水位146m(河底高程140m)。左岸山坡斜墙前面压坡范围内2条,高程153.5~156.2m,缝长15m,宽